• Aucun résultat trouvé

A new artifact in the trade : Notes on the arrival of a computer-supported manufacturing system in a technical school

N/A
N/A
Protected

Academic year: 2022

Partager "A new artifact in the trade : Notes on the arrival of a computer-supported manufacturing system in a technical school"

Copied!
15
0
0

Texte intégral

(1)

Published in Sven Ludvigsen, Andreas Lund, Ingvill Rasmussen, Roger Säljö, (eds), 1 Learning Across Sites. New Tools, Infrastructures and Practices, pp. 88-101, 2010 which should be used for any reference to this work

(2)

2

(3)

3

(4)

4

(5)

5

(6)

6

(7)

7

(8)

8

(9)

9

(10)

10

(11)

11

(12)

12

(13)

13

(14)

14

(15)

15

Références

Documents relatifs

To recapitulate, we began from interaction forms that have been shown to relate to collaborative learning (i.e. reflective and task focussed interaction), attempted to design

President Clinton launched a national study, which involved both the government (federal executives, state and local authorities) and private industry, to better understand

Efforts of rationalization have been performed this last decade to explain the formation of the alumina supported oxomolybdate phases. It has been claimed that

For instance, the average applied tariff of the 34 countries that account for 95 percent of world trade and GDP is roughly 7 percent in the manufacturing sector (see table 1,

⇒ Overall, the data suggest that the StraBL-questionnaire is a valid and reliable measure of learning strategies in sport and is worthy of further development and use:

A Gandolfi camera of its one crystal showed a virtually identical X-Ray diffraction pattern to that of the new compound obtained by powder reaction, demonstrating that the

We describe the role of the teacher in computer- supported collaborative inquiry learning by five principles which span the whole instructional process, from the preparation of

For each phase, the learning curve was computed by only using the surgical activities that were performed during this specific phase.. The average number of activities is 44 for