• Aucun résultat trouvé

INSTALLING YOUR PERQ2

N/A
N/A
Protected

Academic year: 2022

Partager "INSTALLING YOUR PERQ2 "

Copied!
19
0
0

Texte intégral

(1)

P

I:.Dr\ L..P\.'-L.

Systems Corporation

INSTALLING YOUR PERQ2

PERQ2 USER GUIDE

March 1984

Copyright(C) 199~

International Computers Limited Lovelace Road Bracknell

Berksh i re RG12 .. SN England Copyright(C) 199"

PERQ Systems Corporation

(2)

P

t:.DA J:,~\.L

Systems Corporation .

INSTALLING YOUR PERQ2 March 1984

Copyrisht(C) 19Bi

International Computers Limited Lovelace Road Bracknell

Berkshire RG1Z iSN England CopyrishtCC) 19Bi

PERC Systems Corporation 2600 Liberty Avenue P. O. Box 2600 Pittsburgh. PA 15230

(i12) 355-0900

(3)

This document is not to be reproduced in any form or transmitted in whole or in part. without the prior written authorization of PERQ Systems Corporation.

The information in this document is subject to change without notice and should not be construed as a COIIIDitment by PERQ Systems Corporation. The company assumes no responsibility for any errors that may appear in this document.

PERQ Systems Corporation will make every effort to keep customers apprised of all documentation changes as quickly as possible. The Reader"s Comments card is distributed with this document to request users' critical evaluation to assist us in preparing future

documentation.

PERQ and PERQ2 are trademarks of PERQ Systems Corporation.

(4)

Installing Your PERQ2

INSTALLING YOUR PERQ2

GENERAL INFORMATION

Ph~sical Dimensions

Processor Display

Standard tablet

High-resolution tablet Keyboard

Power Requirements Model

-00 -10

Environment

Voltage 220-240 50Hz

11 0-120 60Hz

Height 660 DID

430 mm 15 DID 45 mm 42 mm

Current

SA SA

Temperature 10 to 35 degrees C Humidity

n

to ~ RH

- 1 -

Width 390 DID

325 DID

208 mil 395 18

486 aD

March 5, 1984

Depth Weight 720 DID 75 kg 373 _

16 kg

268 .. 1.5 kg

395 aD 3 kg 228 DID 2.5 kg

(5)

Installing Your PERQ2 March 5, 1984

Tool s Needed

A small, bladed screwdriver

WARNING

TIllS EQUIPMENT IS NOT SUITABLE FOR DIRECT CONNECTION TO AN IMPEDANT NEurnAL (I T) POWER SYSJEM.

CAtITION

1. Ensure that all units are operated on a firm, level surface at all times.

2. Do not pos it i on the equ i pment where it. i 11 be exposed to direct sunlight, high temperature, or high humidity.

3. Do not position the equipment in a dirty, dusty, or explosive atmosphere.

(6)

Install fng Your PERQ2 Karch 5, 1984

Figure 1. Typical PERQ2 Syste.

- 3 -

(7)

Installing Your PERQ2 Karch 5, 1984

INSTAU.ATION PROCEDURE

1. Unpack and check the goods recei ved.

After you unpack the boxes as shown on the stickers on the outside of the boxes, keep the packing materials if you have a contract that requires you to return your system for service or repair.

You should have the following items:

Lever (for adjusting the feet of the processor) Installation test floppy disk

Processor with main lead and GPIB interface cable Display with power cable, interface cable, and

co-ax cable Keyboard

One of the following tablets:

Standard tablet with 3-button puck High-resolution tablet with power cable

and 4-button puck

You may also have one or more of the following optional items:

Stylus (for high-resolution tablet) Loop-back pI ug for RS232 interface

No. 2281 Laser printer with controller board and

20' interface cable

No. 2283 Letter quality printer with 20- RS232 cable No. 2284 Electrostatic printer/plotter with GPIB

interface cable

No. 2285 Dot matrix impact printer with 20' RS232 cable Ethernet connection cables and transceiver

Direct connection cables

Modem connection cable with barrier box and additional cable if necessary

IMPORTANT: Contact your suppl ier immediately if anything is mi ss i ng, damaged,. or incorrect.

(8)

Installing Your PERQ2 Karch 5, 1984

2. Prepare the high-resolution tablet (if supplied).

You must magnetically bias the high-resolution graphics tablet before use (and also subsequently if magnetic materials are accidentally placed on or near it). Bias the tablet as follows:

Hold the magnet as shown below, with the arrows uppermost and pointing toward you;

Place the magnet firmly against the surface of the tablet and wipe diagonally from upper left to lower right in one

continuous motion.

Figure 2. Biasing the High-Resolution Tablet

CAUfION

Once you have biased the tablet correctly, store the magnet away from the tablet and other magnetic media such as floppy disks.

3. Prepare optional peripherals.

Refer to the installation instructions supplied with the applica- tion kit for your peripheral.

IMPORTANT: All equipment connected directly to your PERQ2 pro- cessor must be powered from the same phase of main supply and share a common safety ground.

- 5 -

(9)

Installing Your PERQ2 March 5, 1984

4. Prepare the processor.

The packing piece 'must be removed from behind the door catch of the floppy disk drive at the front of .your processor. Press the door catch to open the door and eject the packing.

Figure 3. Removing Packing fro. Floppy Disk Drive

Then locate the processor in its final position (if the final position will prevent access to the rear panel, move the processor as near as possible to the final position).

5. Connect the units.

Details are given on Figures 4 and 5 and in the descriptions following these figures.

(10)

Installing Your PERQ2 Karch 5, 1984

DDODDODeOO

Figure 4. Rear Panel of Processor

- 7 -

(11)

Installing Your PERQ2 March 5, 1984

PrOCellOr

r---....

AC main. IUlIPly

~~EEo,. 'l

HIGHRLN.

TABLET POWER

VIDEO OUT

VIDEO IIF

LJ ...

C : "~4-outton -c:::::a Stylus puck

11" -..,..,...

H .. h~eIOIution Tlblet

.rrier boll

1 - - - 0 .. _ _ ..

IPr

inter /plot ter

.... - ..

K~rd

I~

RS232

A

o---=---o .. I ___

ll.tter-qu.l it)' or . . tr ix pr Int.

,~·--~m

, I

,

...

RS232

B

0----....;..---·::

Barrier boll

LASER PTR

GPI8

.. ··----D

lllSW' pr i n t er

Junction boll

Et~n.t O~---1DO t.!':;t!

OEM device

(12)

Installing Your PERQ2 Karch 5, 1984

Display

Figure 6. Rear Panel of Display

Connect the unlabelled co-ax cable between VIDEO

our

on the

processor and VIDEO IN on the display.

Connect the cable end labelled PERQ VIDEO to VIDEO IIF on the processor, and the end labelled VIDEO to INlERFACE on the display. Secure both ends by tightening the screws on the plugs.

Connect the cable end labelled PERQ VIDEO to VIDEO POWER on the processor, and the end labelled VIDEO to POWER on the display.

- 9-

(13)

Installing Your PERQ2 March 5. 1984

Keyboard

-_0-

Figure 7. Keyboard

Plug the coiled cable attached to the keyboard into the display socket marked KEYB'RD.

Tablet

Standard tablet:

Figure 8. Standard Tablet

(14)

Installing Your PERQ2 March 5, 1984

High-resolution tablet:

Figure 9. High-Resolution Tablet

Ensure that the round 5-pin plug and the socket at the rear of the tablet are connected.

Connect the cable end labelled PERQ GPIB to GPIB on the processor, and connect the other end to the tablet. Secure both ends by tightening the screws on the plugs.

Connect the unlabelled cable between TABLET POWER on the processor and the tablet. Secure the cable at the tablet end with the clip provided, leaving sufficient loop of cable between the clip and connector for subsequent removal.

LOOI' OF CAilLE

Figure 10. Underside of the High-Resolution Tablet

- 11 -

(15)

Installing Your PERQ2 Karch 5. 1984

Connect the puck (or stylus) to the tablet by plugging it into the round 7-pin DIN socket on the front of the tablet.

Figure 11. Front of the High-Resolution Tablet

/

(16)

Install i ng Your PERQ2 March 5. 1984

Opt i onal cOnnect ions

Laser printer (No. 2281)

The laser printer is equipped with a controller board. Plug the board into the I/O option slot on the processor and connect the cable to the D connector on the printer.

Letter-quality printer (No. 2283)

Matrix Printer (No. 2285)

Connect to the ~ socket (A or B) on the processor.

Electrostatic printer/plotter (No. 2284)

If you have a high-resolution tablet. connect the interface cable from the printer to the GPIB connector on the tablet.

If you do not have a high-resolution tablet. connect the

printer interface cable to the cable from the processor's GPIB socket. You may wish to tape over the exposed contacts of the GPIB connector at the junction of these cables to prevent accidental damage or contact with metal objects.

Ethernet

Connect to the Ethernet A socket on the processor.

Communications

Connect to the RS232 socket (A or B) on the processor.

For connection by modems (via a barrier box if necessary).

follow your modem supplier's instructions.

Direct connection must be performed only by a PERQ Systems engineer.

- 13-

(17)

Installing Your PERQ2 March 5, 1984

Processor

Plug one end of the main lead into the processor main socket.

DO NOT connect the other end of the lead to your main supply yet.

6. Make final adiustments.

Replace the rear plastic cover on the processor.

Figure 12. R~ar Plastic Cover for the Processor

(18)

Installing Your PERQ2 March 5, 1984

Carefully move the processor into its final position and check that it is level and steady. Use the lever provided to adjust the feet as necessary.

Figure 13. Adjusting the Feet of the Processor

Ensure that the main cables are kept apart from, and do not run parallel to, peripheral cables.

- 15 -

(19)

Installing Your PERQ2 March 5, 1984

7. Connect the processor to the main supply.

Ensure that a properly designed, accessible wall socket has been provided by a qualified electrician.

Connect the processor main lead to the wall socket.

Figure 14. Processor with All Connections Made

WARNING

Never move the processor with the power switched on. Remove the main plug first and consult the PERQ2 User Guide for further

instructions.

Références

Documents relatifs

The designations employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the World Health

Make the six digit number N by writing your three digit number twice. Try

First watch your teacher’s video (don’t read the subtitles, they are not correct!!), then read your teacher’s notes and tips and finally record your video.. Prepare your text

Note:* "definitions of International Glossary of Hydrogeology (1992) followed, except for terms marked ^ for which none available and ^^ for which some qualification deemed

If you are going to install your system as a heterogeneous server, a homogeneous server, or as a dataless client proceed to Section 1.4, "Gathering Preliminary Information

PSEUDONYMS: Pseudonyms can be used in Confer II conferences for items, responses, and messages, and participants can register in the conference under a

A little time invested now will help you make the most of your conference and will give you the skills necessary to participate in any conference at The University of

Canadian Institutes of Health Research, Natural Sciences and Engineering Research Council of Canada, Social Sciences and Humanities Research Council of Canada. Tri- Council