• Aucun résultat trouvé

ANSM Direction de l’inspection Pole Inspection des essais et des vigilances 143-147 boulevard Anatole France 93285 Saint Denis Cedex

N/A
N/A
Protected

Academic year: 2022

Partager "ANSM Direction de l’inspection Pole Inspection des essais et des vigilances 143-147 boulevard Anatole France 93285 Saint Denis Cedex"

Copied!
1
0
0

Texte intégral

(1)

ALLERGAN

Allergan Ltd, 1st Floor, Marlow International, Parkway, Marlow, Bucks SL7 1YL Tel: (01628) 494444 Facsimile: (01628) 494449

Allergan Limited.

Registered Office:

1st Floor, Marlow International, Parkway, Marlow, BucksSL7 1YL Registered No. 1049760 England VAT No. GB 727 3255 34

ANSM

Direction de l’inspection

Pole Inspection des essais et des vigilances

143-147 boulevard Anatole France 93285 Saint Denis Cedex

LRAR

To Mr François HEBERT Marlow, 6th October 2015

N/Ref : MC/39-015

Reference : Response to Materiovigilance Inspection

Dear Mr Hebert,

We are pleased to provide Allergan’s responses to the final inspection report for the Materiovigilance inspection carried out in Marlow offices from Monday 27th April to Friday 1st May 2015.

We remain at your disposal for any further information.

Yours sincerely,

Associate Director Product Surveillance, EAME

Références

Documents relatifs

The aforementioned Active Substance Master File holder hereby authorizes the ANSM, to refer to and review the above mentioned Active Substance Master File in support

D6 The management of the competences, skills and habilitations of the staff involved or likely to be involved in safety and/or MV cases is incomplete, considering the

D7.1 ‐ 31 st  December 2015  D7.2 ‐ 31 st  Decemeber 2015  D7.3 – 31 st  December 2015  D7.4 – 30 th  June 2015  D7.5 ‐ 30 th  June 2015  D7.6 ‐ 31

In response to point 3, a full review was completed on June 12, 2015 of AMED-002 Allergan Risk Management Process For Medical Devices and Combination Products, as well as the

D5 The management of the CAPAs/FSCAs by NAGOR Ltd is not completely satisfactory, which compromises the proper processing and notification of the serious incidents or risks of

It should be noted in this summary, the absence of a major European group: BIOTRONIK, for which the German competent authority, responsible for the implementation

In practice, most of the requests so far made to the Inspection Panel a llege th at the Bank has not followcd its environmental and social policies a nd

10 Among the most quoted, are the environment assessment policy, the indigenous peoples policy and the involuntary resettlement policy, as well as the policies