• Aucun résultat trouvé

SCHEDULE II / ITEM 5 March 2008 LAND INFORMATION SYSTEMS Note: This examination consists of 9 questions on 1 page. Marks No calculators allowed

N/A
N/A
Protected

Academic year: 2022

Partager "SCHEDULE II / ITEM 5 March 2008 LAND INFORMATION SYSTEMS Note: This examination consists of 9 questions on 1 page. Marks No calculators allowed"

Copied!
1
0
0

Texte intégral

(1)

CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS ATLANTIC PROVINCES BOARD OF EXAMINERS FOR LAND SURVEYORS

SCHEDULE II / ITEM 5 March 2008 LAND INFORMATION SYSTEMS

Note: This examination consists of 9 questions on 1 page. Marks No calculators allowed

Q. No Time: 3 hours Value Earned

1

A general-purpose database management system (DBMS) is supposed to handle all kinds of data, including spatial data, required in a LIS or GIS. If this is the case, why do we still need to develop specialized GIS software to handle spatial data?

10

2 Define and explain the differences between "accuracy", "precision", "error"

and "uncertainty" in the context of land information systems. 12

3

Discuss the trade-off between “storing minimum topological relationship in a LIS database” and “computing them on the fly when required”. What is the trend? Why is it?

12

4 What is an entity-relationship (ER) model? How is it used in LIS/GIS

database design? Support your answer with examples. 12

5

Describe in detail the commonly-used methods for collecting terrain data.

What are the advantages of storing digital terrain in a TIN rather than in a DEM?

12

6 What are the major issues and problems in sharing geographic data?

Explain the role of standards and metadata in sharing geographic data. 12 7 Explain the data-related technology issues in LIS/GIS, especially in

collecting geographic data using new technologies. 10

8

"The technology issues of GIS today have not very much to do with the lack of adequacy of technology per se. Instead, they are concerned mainly with the ability of GIS users to evaluate and manage technology". As a GIS/LIS manager, would you agree or not? Explain why.

10

9 List and briefly explain each of the steps of evaluating and selecting

LIS/GIS software 10

Total Marks: 100

Références

Documents relatifs

If a client in forestry asks you to build a simple geospatial database that deals with forests (name, total area, perimeter, % of unexploitable land, average area of included

I-5 Database Management 2008 03 1 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS ATLANTIC PROVINCES BOARD OF EXAMINERS FOR LAND SURVEYORS.. SCHEDULE I / ITEM 5 March 2008

How does the relational model handle the following relationships between tables:. a)

If a client in forestry asks you to build a simple geospatial database that deals with forests (name, total area, perimeter, % of unexploitable land, average area of included

II-1 Geodetic Positioning 2008 03 1/2 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS ATLANTIC PROVINCES BOARD OF EXAMINERS FOR LAND SURVEYORS.. SCHEDULE II / ITEM 1 March

An Act of the British Parliament gave the Crown in right of Canada ownership of lands for certain purposes.. Name the statute, give the year of enactment and name three of

What are the steps involved in designing a computer-based LIS database using a particular piece of GIS software, starting with a conceptual database design without regard to

Do you agree that spatial data integration is an age-old problem but the use of?. digital spatial data has accentuated