BUFFALO FORGE CO1bANY

A CASE STUDY IN SALES ENGINEERING MANAGEMENT by

VICHAEL JOSEPH 7OND

SUBMITTED IN PARTIAL FULFILLMENT

OF THE REQUIREMENTS FOR THE DEGREE OF

BACHELOR OF SCIENCE at the

MASSACHUSETTS INSTITUTE OF TECHNOLOGY

MAY 12, 1977

Signature redacted

Dep met j ar

*

l : ineering

/> 12, 1977

C-rti f! /Signature redacted

/~v

%-A r

Signature redacted

Accepted b

Cai-a, k taaCmite n hei

ARCH VES

(2)

MITLibraries

77 Massachusetts Avenue

Cambridge, MA 02139 http://Iibraries.mit.edu/ask

DISCLAIMER NOTICE

Due to the condition of the original material, there are unavoidable flaws in this reproduction. We have made every effort possible to provide you with the best copy available.

Thank you.

Some pages in the original document contain text that runs off the edge of the page.

(3)

BUFFALO FORGE COMPANY

A CASE STUDY IN SALES ENG1NEERING MANAGEMENT by

MICHAEL JOSEPH BOND

Submitted to the Department of Mechanical Engineering

on May 12, 1977, in partial fulfillment of the requirements for the Degree of Bachelor of Science

ABSTRiCT

This thesis deals with a sales engineering decision faced by a company which produced air handling equipment. In the first sectionof my thesis, the company's background is explored and in subsequent sections the problem faced

by the company is described. This is meant to be the basis

for class discussion on the decision making process of a sales engineer.

The second part of the thesis presents the autho 0 s

analysis of the company's situation, as well as his recommendations for action.

The final portion of the thesis is a teaching note which is meant to serve as a guide to a discussion leader who uses the case in a classroom or other setting.

e) r A 1Prc I ter fr

Alternatives

(4)

-3-ACKNOWLEDGEMENTS

I would like to thank the following people who helped me considerably with my thesis:

Mr. Robert T. Lund, my thesis supervisor, who had the infinite patience and understanding to see me through all the problems I faced in producing this thesis.

Mr. Joseph Johnson, Vice President of the Boston branch of Buffalo Forge, who assisted me in gathering

all the information I needed to write this case,

I would also like to thank Peggy Garlick, the

course secretary, who assisted me with all the technical problems I faced in finalizing this thesis.

(5)

TABLE OF CONTENTS Title Page . . . . Abstract . . . . Acknowledgements . . . . , . . . 0 0 .0 0 0

1

. . 0 . 0 0 0 0 0 2 . . . 0 .0 0

3

BUFFALO FORGE COMPANY . Is 0 0 0 0 0 4

Analysis of BUFFALO FORGE CASE . . . . . . 0 .19

Teaching note for BUFFALO FORGE CASE . . . . .22

(6)

BUFFALO FORGE COMPANY

The Buffalo Forge Company was a leading producer of air handling equipment. Late in 1967, the Boston branch of Buffalo Forge was chosen to supply the equipment necessary to complete the air conditioning system for the new addition to the Boston Public Library. Mr. Joseph Johnson, Vice

President of the branch, was responsible for the sale. In

1972, after the equipment had been installed, Piro Johnson's

aid was requested in alleviating a noise problem caused by that equipment.

Products

Buffalo Forge produced a full line of air handling equipment and heat transfer equipment. These products, which comprised 90% of Buffalo Porge's total sales, included fans, blowers and heating and cooling coils.

Fan sizes ran from small ventilating fans with volumetric capacities as low as 50 cubic feet per minute

(CFM), to heavy duty fans with capacities exceeding 1,000,000 CFN. These fans were sold for applications such as kiln

exhaust, gas recirculation, air cleaning systems, gas exhaust

and ventilation. The shapes, sizes and configurations of

these fans varied according to the function performed and the physical constraints of the specific order. The shape of the fan blade, for instance, could be changed to provide tubeaxial, vaneaxial or centrifugal flow. Tubeaxial and vaneaxial fans were lighter and smaller than centrifugal fans of the same capacities and, therefore, required less operating space. They were also less expensive. Centrifugal fans, however, were more efficient and less noisy than

tubeaxial and vaneaxial fans. Fans could also be altered to provide direct- or belt-drive.

Pressure blowers were designed to deliver gas or air at pressures of up to 5 psig and volumes of up to

100,00 CFM. These blowers were capable of handling gases

at high temperatures, As with fans, Buffalo Forge produced blowers to fit varied specifications. The CB-type blowers were all related in basic design, while R-type blowers were modifications of the CB blowers, altered to meet special operating conditions. Because these blowers supplied air at large volumes and higher than normal pressures, they had a variety of applications. Furnace drafts, which must

(7)

-

6-provide large amounts of pressurized air for effective heat transfer typically consist of pressure blowers. Pressure blowers were also purchased as air compressors and gas boosters.

Heating and cooling coils were manufactured by Buffalo Forge for use in heating and air conditioning

equipment. Buffalo Forge sold these coils individually or as part of one of their own systems. These coils could be produced to meet the consumer's size and geometric

specifications.

Energy conservation and air pollution control equipment were sold by Buffalo Forge on a smaller scale for industrial use. Of all the air handling equipment produced by Buffalo Forge, these items comprised only 20% of the total sales. Energy conservation products,

such as evaporative coolers, heat recovery apparatus and humidifiers, employed modern heat transfer techniques and could be combined to form efficient systems for

cooling and heat recovery. Buffalo Forge marketed several types of dust collectors and air scrubbers for use in air pollution control. This equipment could be varied

both in size and geometry to meet specific job constraints. The remaining 10% of Buffalo Forge's total sales were derived from a line of pumps and machine tools.

These products were produced on a very small scale and

had limited capabilities. Although the pumps had a restricted adaptability to needs for which they were not produced,

they were highly versatile with respect to the jobs they performed. Capacity, mounting position, material and parts could be varied to meet given specifications. Buffalo Forge pumps were used industrially typically for boiler feed and suction or discharge pumping.

Company Organization

The Buffalo Forge Company was based in Buffalo,

New York and employed over 1700 workers. There were three manufacturing plants in the United States and one in

Canada which produced all of Buffalo Forge's equipment.

The equipment was marketed internationally by Buffalo Forge's own sales offices in the U.S., Canada and Mexico.

Buffalo Forge's main office and factory personnel consisted of the company's top executives, sales managers, applications engineers, support technicians and workers. The Buffalo facilities included a Research and Development Department, and Engineering Department, a factory shop

(8)

for manufacturing, an Assembly section and Support and Testing facilities.

The organization and size of Buffalo Forge's sales branches varied depending on the location and availability of business. Each office consisted of from

one to six sales engineers, one or two secretaries, files and office equipment. Many of the offices were connected directly to the home office in Buffalo by a computer system and several of the branches were incorporated as

subsidiary companies to take advantage of local tax breaks. The Boston branch of Buffalo Forge, which covered all sales in Maine, Rhode Island and half of Massachusetts, handled the Boston Public Library order. The organization

of the branch is depicted in Figure 2. Mr. Joseph Johnson, the branch Vice President, represented buffalo Forge

during this sale. Although all sales engineers of a branch participate in each sale, only bne is ultimately responsible for developing a bid and ensuring customer

satisfaction.

Mr. Johnson had been an employee for Buffalo Forge since graduating from Purdue University. After

receiving his B.S. in Mechanical engineering, Mr. Johnson underwent a typical two year training program at the Buffalo

Forge main office. This program trained the engineer in all phases of the manufacturing process in order to prepare him for a position as sales engineer in one of the company's

sales branches. A detailed description of this training

process is depicted in Figure

3.

In

1958,

Mr. Johnson

was assigned to the Boston sales office.

Competitive Advantage

The Buffalo Forge Company began production almost 100 years before the Boston Public Library order. Since then, Buffalo Forge had expanded and improved both

its facilities and engineering know-how. Mr. Johnson

believed that several factors contributed to the continued successful operations of the company. Among the specific factors he cited were the fine quality of the machines produced and their consistent performance. This, he believed, was due mainly to the fact that all the parts

for the air handling and pumping equipment were manufactured and tested solely by Buffalo Forge.

Other advantages mentioned included better training -of sales representatives, superior manufacturing facilities

(9)

and an excellent Research and Development Department.

Buffalo Forge held several patents on their equipment design. Finally, Mr. Johnson believed that because

the manufacturing plants and sales branches interacted so closely on each sale, Buffalo Forge could alter the construction of most of its products to meet specific performance standards and physical constraints required

by buyers. Mr. Johnson credited this flexibility with much

of the success of Buffalo Forge to produce quality air handling equipment for almost any industrial or commercial application. This same relationship existed between the

sales engineers within each branch . Each engineer

contributed to each job, although only one was responsible. Salaries were not determined by individual sales, but

remained relatively stable because of a profit sharing program. Each Buffalo Forge branch office received 10% of all sales produced by that branch as profit. The total

annual sales for the boston branch averaged

3

million

dollars. The profit derived from these sales, $300,000 in this case, were split in a predetermined manner among the employees. Mr. Johnson believed that this method provided incentive to all the sales engineers to support each other and take advantage of individual skills, while simultaneously maximizing profits.

Boston Public Library Addition

Construction of the addition to the Boston Public Library commenced late in 1967. The job had been awarded to the Architects Design Group of Boston and

Philip Johnson of New York. The architects subsequently selected Francis Associates, Inc. as consulting engineers to help design the mechanical portion of the addition, including the heating and air conditioning systems.

Le Messurier Associates, Inc. was selected to handle the

structural part.

The role of general contractor for the addition was awarded to the Turner Construction Company, who in

turn awarded the mechanical portion of the contract to the Limbach Company. The Limbach Co., therefore, was responsible for the installation and purchase of all the mechanical portionsof the addition. Sam Rogers, an engineer for the Limbach Co., was designated as project engineer.

Francis Associates, Inc. is one of many companies

(10)

sales representative. Mr. Johnson, who was the representative

in this case, had the responsibility of regularly providing

Francis Associates with information concerning Buffalo Forge equipment and all new developments. Mr. Johnson had been doing this more or less on a regular basis for almost fifteen years and had developed a close friendship and trust with the people there. Because of this confidence, the Francis Associates, who did a lot of consulting work all over the world, frequently provided Buffalo Forge with opportunities -to sell their equipment. Luring the course of the mechanical design, Francis Associates requested the aid of Mr. Johnson in developing an air conditioning system for the addition. The Francis Associates had developed

data specifying the heating and cooling requirements for

the addition. These specifications, shown in Figures 4 - 7,

were presented to Mr. Johnson. ivir. Johnson subsequently went through all the data with the consultants at Francis Associates and indicated which Buffalo torge equipment were capable of meeting the requirements. The Francis Associates had to take into account certain space limitations while

designing the system. The Architect' design provided a limited amount of space in which the system was to fit. With this

in mind, Francis Associates elected to use vaneaxial fans in the system design. These fans, being smaller and lighter, could satisfy the space limitations. Pr. Johnson advised Francis Associates that, although vaneaxial fans could meet the space and performance specifications, they would also be noisier and might cause problems in this area. The Francis Associates thought that the equipment would still have satisfactory noise levels and stayed with their

original decision.

The equipment was sUbsequently bid through the

Limbach Company. The total cost of the equipment was $85,000, a medium size order for the buffalo Forge Company whoe

orders typically ran from 50 to 1,000,000 dollars,

This equipment is pictured in Figure 8. The bid was

accepted and the design utilizing the buffalo Forge

equipment was incorporated into the architects' design and given to the Turner Construction Company. Turner then

directed the Limbach Company to purchase and install the equipment.

As the construction of the addition progressed, Mr. Johnson stayed in constant contact with the Francis

Associates and Limbach Company. The job required drawings of

the equipment and information concerning erection ,

operation and maintenance of the fans. Mr. Johnson was particularly concerned that the installation and operation

(11)

of the Buffalo lorge equipment in the addition ran smoothly. He knew that this job was very prestigous and, if done

well, would give the branch a good chance of landing future job orders. Mr. Johnson also felt that Buffalo

Forge had something to prove with this order. A couple

years before the Boston Library addition was designed,

Buffalo 1'orge had lost the new Rockefeller Library order

in New York. The job had been awarded to a competitor who claimed to have superior equipment.

By September 1972, the 15 million dollar addition

was near completion. At this point the air conditioning equipment was completely installed and operating. As

had been anticipated by Mr. Johnson, however, the equipment was producing noise at unacceptable levels, both inside and

outside the building. Francis Associates consequently requested the assistance of Buffalo Forge and Mr. Johnson in solving this problem.

1972 was an unusually busy sales year for

Buffalo Forge's Boston branch and in September all the representatives were working on new orders. In order for Mr. Johnson to work out an effective solution to the Boston Public Library noise problem, he would have to divert much of his time away from the prospective order he was involved with. Mr, Johnson realized that a complete

study of the problem was necessary. If the problem could be solved, the changes which would have to be made in

the system would probably be minor. The extra items needed to correct the problem would be purchased from Buffalo Forge by the Limbach Gompany. The profit realized

by Mr. Johnson's office, however, would be negligible.

The cost of sending a trained engineer to the job site to take noise level readings and evaluate the problem would be approximately $2,000. This cost would be totally

absorbed by Buffalo Forge, whether or not a solution was found or their advice was followed.

(12)

B iuUfa I Buffalo Forge Fans

TYPE "B" AXIAL FLOW FANS

ADJUSTAX ®AXIAL FLOW FANS

VA

CENTRIFU - 11 -r NLINE FANS GAL

(13)

Figure 2

BUFFALO }'ORGE COiv1PA~Y - 12 -Organization Chart of Boston Branch Personnel

September,

1967

Sales Rep. Tony Lockwood Secretary Betty Crane President Bob Muir Vice President J· oseph Johnson Sales Repo Bert Jordan Secretary Eleanor Smith

(14)

BUFFALO FORGE COIVIPANY

Two Year Training Program at Home Office

Assignment to Engne Dept Assignment to Design Office Assignment to iResearch and Develornment Assignment to Testing Work in Shop

[

Contact with Sales Offices Sales hssignment to Permanent Sales Office I i I

(15)

Figure 4 specifications Co/.. s- _ c7/6AJ

8~0--14 -7-//-/. CL-o0/z IC SYS TE A- AF 04. (&r~~~ny- 2sC c7/00) r7 /a/ Sen i /e o 'la/ L 4 ea7 ~ 7 /S ol/<

A

6

$'2Z ~ / ZS, 60 a60 7-% -- 4OOO c/>

6i/r e/f /,62a2 A

. 7r"7 e. / oe7 S- supp/y

7~57F

Ae~ 40 /P e2-4 /270"~ 40 /N/ x 2 4 ' s?7o ,aP 4/ 0) x/ 8) 5. . = 3Z 7 00 0 7;7x/;/,Joa /L =4

5e;,

-~ ~ 7 ___ ___ _ a/ . 2 5'{121, - 91, S/// 20 000 7U 1742,ooo ~53cX9~

2~F4

I/ Assum-3 Z

0

//5'7, 0013nI

3

5-7,0 0 0 - -r C) 4 -ly ; e--59,6dac E ru''~# 3).

Heating and cooling

Mt~AJ7 i7

COOI-/'G-,AeA)

- 7. - / ' 13 elz. /37 C)O) T/ 9.Z,.47 /~ An > :- / 7- ", to o /3-n;11-1 / Al E? A. R A' $1n o s A se /v 0- -A elm e

7- C-z;, lpooi,-I)

75'P /3-- 2.2 f-'= ::z,8 /" . . n /2/eum oaoa Mc7s1T, 0 /

mirram :

(16)

1,J_ __ _

S 1r

Heating Pnd Cooling 5pecifications

Au

Ai3'/ Ek , e ' .. G

0

6~.O ~7~/&& - 5j,3PW13 2'/- 1 ,72 IL. _ ss_____ /n_ L

3/le

/ 9070 0 13 7V.,0/ Ae

,;y

- - *I~ *~/~ 3 ,9e i4r, /

Roo

T

7S

F

01 ''0-'

A

/ 4-Q

go"*2

80/~ ~ FS oO

?18,&5

R/- 2, /r

a

m4e o

m

skAe 101 -4 -- '

0

76~ /'Vv/3

// d

c

oe I. I CR1Le 2.,9'ySH sz8' 0 I /e 7z / el k s room * Zi edvInyg S~3, / 0,D, /, '1'8 E1o/c, .g 7,r . S010.>< 9 c o -a.') -- )(/.,0 ) - ?0, -2 '1'' 0 . / 72m z'/

(17)

'4 - _ _ _ i*

Figure 6

Heating- and Cooling pecifications

(9 )

jj~ ~ ~D&

(6'.)

7

-m

-3,~I ~

~4

1~

'c~c cA

,l 6.'e o //c //wwi prt 4 /.-/ 4 p -Asx :9/M Qo $4>1 9.-3 c/ )~ ~54~5

4a~'ss~

/3rL//Atk~ S/ /2.A. is e / / O/ Ds 4 c .JC/ :.a J- /grrlj R / 2-f so)

/4||a

Cr

x' 4Cois5=3'62PK1OA

7Z774t

-z

it/s-OceK

- I..r, (/

0

~6~PA4

~(,

(i)

? :-7 a.)Z

/Pe la n 4 i'rE rrA ega ck-a .

X 301AP =

/ 7-0 IP

4+ /7 z1--6 c . .?// 13.?ao. / 14z- -?Z 2.9 " .,a e-/- g , /

-2f ,Q e-7c-,/1,/ 7 o tr .

; ov -.

fdl

co

(18)

-7t

Figure7SPL

Power Consumption 6pecifations APPROXIMATE

-'7H

L

MOTLOR H. P. LOADS

Basement Mechanical Room Water Circulating Pumps Duplex Condensate Pumps Air Compressors

Supply Air Fans Return Air Fans Exhaust Fans

7th Floor Mechanical Room

285HP 3- Absorption Machines 2OHP 30HP ?87.5 1P

/430 i/P

0 Total= 50 HP = Motor Rating 15HP 10. 4 KW power input 1/4 HP nameplate purge pump 1/4 HP Water Circulating Supply Air Fans Return Air Fans Exhaust Fans Cooling Towers Rare Books 15 HP 265HP

/06

14P

G

HP

= 240 HP 2 - 20 HP compressors

2 - 3 HP Blowers on emergency generator

Motor Control Centers Basement and 7th floor Mechanical Room. Central Temperature Control Center Basement Mechanical Roomjk

(19)

- 18

-Buffalo forge Equipment used in

the Boston Public Library

Addition - - - GREASE LINE IN THIS REA HORIZ. MOUNTING CONE (OPTIONAL) I.--X--.4.- x - SEE F -3015

--- N ~SIZES 22A THRU 29E A WHEN EXPLOSION PROOF MOTOR 16 SZS3ATR 4

REQUIRED, INSTALLER MUST 5TSIZES 6 THRU84 FIELO WIRE DIRECTLY TO MOTOR.

-- -

-w U.

'K -0 K INLET BELL

(OPTIONAL) \ P NO AND DIA. HOLES,

STRADDLE j.

E SUPPORT LEGS

(OPTIONAL)

BIG BUFFALO HIGH CAPACITY AIR HANDLING SYSTEMS

wMk

(20)

Analysis of Buffalo 'orge Case

The sales engineer faces a two-fold problem in doing his job. First, he must possess the technical expertise necessary to analyze complex engineering

problems and subsequently find solutions through applications of his company's equipment. Secondly, he must sell this

equipment to various companies and be responsible for its performance. In the case of the Boston Public Library addition, Mr. Johnson faced an additional problem due to

a mistake by the purchasing company.

The most important issue of the case is whether or not Buffalo 'orge should correct the noise problem

created by their fans. There were many factors Mr. Johnson had to consider.

First of all, the responsibility for the

problem had to be accepted entirely by the Francis Associates. Mr. Johnson, as was stated, worked closely with the

Francis Associates throughout the job, proViding them with all the details of the air conditioning equipment. Because of certain space limitations in the architect's

design, the Francis Associates chose to buy vaneaxial fans for the air conditioning system. Mr. Johnson advised

Francis Associates of the potential noise problem; these machines might produce. At this point, Francis Associates might have avoided the problem either by seeking a

competitor's equipment or buying Buffalo Forge centrifugal fans, which are quieter. This would involve, however, a change in the architect's design and spending extra money to

buy the more expensive fans. Francis Associates decided to gamble that the vaneaxial fan noise levels, although higher, would still be acceptable, buffalo Forge was not under contract and, therefore, not responsible to fix

the machinary when the noise problem did crop up.

From a purely economic viewpoint, Buffalo Forge did not stand to make a substantial profit by selling the accessories needed to alleviate the problem. sending a man to analyze the situation and recommend the suitable equipment was a cost that would slash the company's profits

by $2000 alone. Add to this the possibility of losing

current business orders by tying up a top sales representative, Mr. Johnson, and the economic prospects seem poor. The

Boston Branch of buffalo Forge was very busy at this time due to a high level of construction and subsequent

opportunities for sales. Any extra time Mr. Johnson would have to spend correcting the noise problem would, of

course, subract from the time he had available to work on other orders. It was not even certain if the problem

(21)

was a correctable one. The order for the Boston Public Library addition, worth $85,000, cannot be considered a

large order relative to other job orders which ran as high as $1,000,000. The total profit for the branch,

10% or $8,5000 in this case, was not very high in the first

place.

Mr. Johnson, however, knew that the Boston Public Library job was a prestigous one in this area, successful performance by Buffalo Forge equipment on this addition would greatly enhance the chances of the branch teing awarded future bids. The equipment involved in the order

was part of a line of equipment which comprised 70% of Buffalo Forge's entire 'sales. Buffalo Forge would risk the reputation

of this line by not acting, even though the fault was not theirs. The fact that Buffalo Forge had lost the

Rockefeller Library order the previous year made the job even more important. A competitor of Buffalo iorge claiming that his equipment was better must have weighed heavily

in Mr. Johnson's mind. Mr. Johnson had to prove that Buffplo .orge did, in fact, produce superior equipment. The industry in which Buffalo Forge operates is very

competitiveand information concerning equipment quality and performance spreads rapidly to prospective buyers.

Finally, Mr. Johnson had to consider his relationship with Francis Associates. After regularly

servicing this company for 15 years, Mr. Johnson had developed a close friendship with the top personnel there. The Francis Associates, who did a lot of consulting in the construction busines-s, had confidence in Mr. Johnson and Buffalo

Forge. Continued good relations with Francis Associates was desirable and would probably ensure more business from

them in the future.

What this case points out is an example of the advantages of sacrificing a little time and money at

the present to ensure customer satisfaction and good

business in the future. By helping out the Francis Associates in their problem, Buffalo Forge would prove that it stands

by its equipment in any case. This, coupled with quality

products, would give Buffalo Forge a good business reputation. Another issue, however, was if Buffalo Forge,

in light of the fact that the job was so important, should still hpve sold the fans, knowing that a noise problem might exist? It was stated that Mr. Johnson knew of the

potential noise problem. It seems evident, therefore, that a chance was also taken by Mr. Johnson that his equipment

(22)

would perform at adequrte noise levels or that any problems could be corrected. Bad performance on this

job would have proven exactly the_ opposite of what Mr.

Johnson wanted to prove. Buffalo Forge equipment would have been proven to be inferior. A better alternative would probably have been for Buffalo Porge to send a man to make sure all the equipment had been acoustically sealed during the installation. In this way, any errors csused by faulty installation or construction would also be avoided. Consideration of this alternative may have been overlooked by Mr. Johnson. In any case, this

issue points out that foresight should be followed up by action, not warnings. Mr. Johnson could have avoided the first

issue entirely by making sure that the problem would never appear.

(23)

Teachiny Note to the Buffalo Forge Case Study

There are several points of interest which can be brought up for class disd.ussion. These are:

A) Francis Associates relationship with the Architects:

The question here is, should consultant firms interact more closely with architects during the engineering design process or accept what is given them as

being final? The class could discuss the problem of time lost through overall design changes as opposed to time gained by simplifying a job.

B) Mr. Johnson's personal friendship with the Francis Associates.

Discuss how much this relationship affected the eventual decision. Are these types of relationships desirable in business?

C) Would a decision by Buffalo Iorge to correct the problem

appear to an outside company as an admission of guilt? Should this be considered in the decision? What are the consequences if buffalo torge tried and couldn't fix the problem?

D) Should Buffalo Fotge1,have siold- the fans in the first- place,

in light of tme forseen problem?

E)The class could discuss the pros and cons of profit sharing as utilized by the Boston branch of Buffalo Vorge. Does this method create incentivE or create a

complacent attitude? Would weaker sales representa tives tend to rely on better ones too much?

It is useful, in this case, to point out how Mr. Johnson actually handled the problem and which, if any, of the future prospects for business eventually materialized. This information is given in the form of an Epilogue.

(24)

Epilogue to the Buffalo i-orge Case Study

In light of all the factors involved, Mr. Johnson decided to try and correct the problem. Mr. Johnson consulted with the Francis Associates and Sam Rogers ofthe Limbach

Company. He decided that noise level tests were in order and arranged to have Howard Fehr, of the Buffalo Forge Research and

Development Department, come to Boston to perform them. His results and report are included in this Epilogue.

Francis Associates subsequently followed the suggestions in the report and the designated equipment was purchased and

installed. In this way, the noise problem was corrected. The possibility of future job orders materialized in the form of the U Mass Medical Building in Aorcester, Mass. Mr. Johnson attributed the winning of that order directly to the

good results produced by Buffalo Forge equipment in the Boston Public Library addition job.

(25)

f,,gO~4LO

i;uz

Co.

A

-. 24

-SOUND PRESSURE LEVELS of

ADJUSTAX FANS for BOSTON FUBLIC LIBRARY

S.0. #69L-17500-52

I visited the Boston Public Library on Wednesday, September 27, 1972 to obtain sound data at various places

in and around the building. The major objective of this

trip was to suggest remedial action for the presence of above

normal sound levels in the area on the ground floor near the main entrance.

The data obtained is presented in this report as

one-third octave band sound pressure levels in dB re 0.0002

microbar. Figs. 2 through 19 are the sound pressure spectra

of the tests obtained at the location defined on each figure.

LIBRARY STATUS

At the time of my visit the building was very near

com-pletion and almost ready for occupancy. No major

construc-tion was being done and all the workmen were doing "finishing", i.e., readying the elevators, completing light fixtures and electrical outlets, placing shelves, and cleaning up. As for the fans, all are installed and in use. However, Bill

Demeris, Limbach foreman, mentioned that there was some minor

system balancing to be completed.

GROUND FLOOR ENTRANCE

Of major concern on this job are the sound levels which

a patron experiences upon entering the library.

(26)

25

-The entire center area (seven floors high) is faced

with marble walls which form a reverberant space which carries any noise present on the seventh floor walkways

down to the ground floor with minimum reduction.

Fig. 1 is a sketch of the seventh floor walkways which

form the upper perimeter of the center area. The circled

numbers are test locations and numbers.

Fig. 2 is the sound pressure spectrum on the ground

floor near the entrance to the library. These levels are above normal and easily distinguishable as coming from the fans on the seventh floor.

Fig.

3

is the sound pressure spectrum on the second

floor landing and is not significantly different from Fig.

2 due to the reverberant quality of the walls. The sound

does not decay sufficiently in this type of an environment

to expect much reduction by distance alone.

SEVENTH FLOOR WALIUIAYS

In order to define the source of the noise, data was

obtained on each of the four seventh floor walkways. Figs.

4

through 7 are the sound pressure spectra on these walkways.

There is no appreciable difference between these levels

ex-cept that Fig. 4 shows slightly higher levels due to the

presence of more doors along the south walkway.

The noise radiated to these walkways is a result of

leakage through doors which lead to the fan shaft areas in

2- 57

10-27-72 S2

(27)

CORNViR? SIAFT AREAS WALKWAYS

-Al

(/7~

I I

)

0:

0

DOORS

fOSTON PUBL/C

L/8RARY

SEVENTH

FLOOR WALXKWAYS

A8OUT CENTE/R OVER eN/RANCE

/VO CALE/-20-72 9. FEA'R.

I 1t iI TEST ZOCA/ONS . a I ~1 I I I ON I I I -t NO SCA L E

(28)

- 27 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 z 0 .0 do 1000 2 10000 FREQUENCY IN HERTZ

5osTOV

PUIC b52A2Y

TEST

9-

?-27-72.

(f ENTER , o ROVD ,ro0p

p

/'$

$o&vo

PRES35L E

F6G.

2

LAND NO. 16 17

80

76

0 c; LUJ co

z

-LJ >0

z

co LU

I-4-o

30 1T 1 I I itrl ~

T

-~

~

I

__ __ - - 4 ~---I *1 -~-~_K-r---mix -40-50-63---80-100--- 125-160-200-250-315-400-500-630-800-100-1 25-160-200-250-315-400-S00 -630-800-100-125 ,5~IIaL i 100

(29)

- 28 BAND NO. 1A 17 13 10 96 21 22 2 94 25 26 27 28 9 2 6 1 32 3 14 33 36 37 38 39 40 41 42 0 100 2 1000 FREQUENCY IN HERTZ

5O5 TONV PI&UIC LIeAY

TEST~ /o

-

9-27-22

ECOND

Fzooe

ZAVo/NG

0 ul

z

-j LLI -LJ

z

I

70

6o

40

,3c

2 1 10000

ii

T

tI -40-50-61---80-100- 125-160-200-250-315-400-500--630 -800-100 -125-160- 200 -250- 315--400-500-630-800-

(30)

00-125-- 29 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 4Im~zJZ

z~z

it 33 34 35 36 37 38 39 40 41 42 z 0 a 1 4 _ _ 1X ~ Z Az I

80

76

6c

40

0 Ix a co

z

I-a

8

I,.,.,

~

Ii

~F it ~ F'

IF

I I I I I II 125-160--200-250-315-400-500630-800- 100-125160-200-250-315400-5 0-630- 800-100-1251.1 2 1000 2

GA

10000 FREQUENCY IN HERTZ

BcS TO/ R uBLIC L/8,5A9Y

TES T

8

-

?-2 2 -72

MIDWAY

ON 5EV5vr7/ FLoo

So rs /iA L{6{ . &AND NO. 16 17 -I

I

I _

.1

KL

I Z

1

1 1 1 1 1 T 1 ! I l i ! ! ! I I I I I 1 ~ ~- ~ ~- * ~ ~- tE]EllTrT!lTrT .4-4444 4. 4 4. 4.1 tZ~Z~Z~4 -1-~ -~-

-30

100 ~

, - /Gc, 4

(31)

-

30

19 20 21

I

-~ 22 23 24 25 26 -27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

MII~~~7

I

~t1

i z .0 -a a '4 100 1000 2 10000 FREQUENCY IN HERTZ

,805To AULIC ZRARy

TEXT

/7-

9-27-2Z

OF SEVE/Th' LOc2/. LAND NO. 16 17 18

80

70

6o

CA

'a 0 U cN Lu w co 0

z

-S U LU z 'a Lu

30

7

--

0

0-6

-8

-00

1:5-10-20

25

-1

-40

50-63

80

-0

-15

16

-00

25

-31

-00-50

-3-t0

-1

12

2

(32)

- 31 -19 20 21 22 23 24 25 26 27 28 29 30 31 l 0 2 u C~4 LU

z

-j LU

K>

LU i-32 33 34 35 36 37 38 39 40 41 42

80

7o 60

1L

-0-0-63--0-100-125-1760-200-250-315-400-500-630-800-100-125-i60-200-250-3I5-400-S -630-800-1O0-125-100 2 1000 2 10000 FREQUENCY IN HERTZ

zS0XTON /UVL/C

L/B'ARx

TEST

/ -

Y-22-22-MIDWAY

ow WALAIAy 0F SEVENT- 17 FLQ00R.

Fp

G,

6

BAND NO. 16 17 1B

A

t121

-

4

--J-i

-Iiz~iz~i - -4- ~ 1 -I

1

-- ~J~7Z ~ - -

-~

I ~

zztzm I-I~.~ - t -iT 4 - t I

j

- - -~ ii 4. _ -f 4 4 -ti - *1~

I

__ _

t ~

4

3o

-0A,

(33)

- 3? BAND NO. 16 17

rnzzF

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 "If-z< .02 4k. Lu w

z

aJo

--z LD

t3

0 -1---~1r1T

-1----K ~-L

-1 1 L - 9ti~

~

z~z

- - -1 ~ ~ ~ 'I -.---I -.

*I-~

t

-. t -- II,

I

I ~

t

1.1

II

t

I

-0-5O-62----80-100-- 125-16O---2Oo-250-375-~oo-50O-63O 800 100 125 160 200-25O-3J5-400-5O0-60-800-10O--125--~

I I 111111 100 2 1000 2

-A

10000 FREQUENCY IN HERTZ 250S TON ISue/ 1c, R y

TEST /

-

9-27-2.

/l'9kD/Ay OF

0/y 6EVEtV /7-,,4.

I ~ F I ~ I I ~ I I I ~ ~ I ~ 11

-rI T r T 1t11111t

I

It t

80

70

6o

40

--- *---- ~ - ~ ~ ~

(34)

33

-each corner. All the doors are poorly sealed and have large

spaces at the floor level. The high noise levels in the

fan shaft spaces, which are discussed later in this report,

are leaking through to the walkways and into the highly

reverberant area above the library entrance. Conclusive

proof of this leakage could be obtained by tests in the area before and after sealing the doors with some type of heavy

metallic tape.

CORNER SHAFT AREAS

Figs. 8 through 11 are the sound pressure spectra

in-side the return air fan shafts. The fans are either in-wall or are in the equipment room immediately adjacent to the walls forming these shafts.

The levels and spectrum shape are much the same in each shaft and these sound levels are the sburce of the sound

present in the entrance hall via leakage through the doors.

SUGGESTED ACTION

After all the data was obtained, Sam Rogers and I met to discuss the problem and come up with suggestions to remedy

the situation.

The obvious place to start is to acoustically seal all the doors between the corner shaft areas and the seventh

floor walkways. If this does not sufficiently reduce the

7251 -7__

(35)

- 34 -LAND NO. 16 17 iR IQ ~ ~1 9~3 23 ~)4 2i '~A 27 ~R ~YQ 30 31 32 33 34 35 3A 27 38 39 40 41 42 Ix c o 0 2 _ z z

co.

wu 100 2 1000 2 10000 FREQUENCY IN HERTZ

BOSTON

Pu0LIC

f 6RARY

TEST /4-

-

9-2,-Z INS/IDE

S

E

co /e og SE\/VNT FLooe.

F6, 6

/00

8o

70 -

lii

- I - -~ L

t

~

it

I

t

ii

F- 40-S0-63--80-100.- 125-160-200-250-3 15-E00-500-630-800- 700-125-160-200-250-315-400-500-630-800-100-125 360 " " u " 1A 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

(36)

21

- 35

El -a 31 32 33 3435 36 37 38 39 40 41 42 zLI7rnzlzIzzl I1iizizI1IIIIIIIIIit-I*-t-i---1~-**---t*_.-.---t-.4-+ 1 ~ ~ ~ * tit- t- I - I

I~~~

~

1 1 1

~

---2

-

v-i

-

4

-it~

1

tli

/00

9o

8o

7o

co 0 U I w 0

z

-i

z

co I-J ~rn1i - -~.---~.

I

- -~- - j -4--,. -40-50-63--80-00-125-160-200-250-315-400-500-630-80-lOO-1 25-6-0-200-250-315-400-500-630-800-100--125-100 1000 2 FREQUENCY IN HERTZ

5

DOSTON

PUBLI6

L/8eARY

7EST

/6

-

?-22-2Z

N/Da'lE

A/E

coReNEz

oF

SEVE*NT FLOo

F

BAND NO. 16 17 18 19 20 22 23 24 25 26 -27 28 29 30

I

4 1 I~ tt-_

1-1

-~

-~-~H-~-ZIZIZII

-'--I-I

I~it

- -. '- -i-50 .L 4 1

1

.i. 4 .4.' 4

1

4. 4 1

-j

~j

10000 i i i i i

(37)

BAND NO. 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

}

I --- r

I

34 353 37 38 39 40 41 42 ii 2 a

-K

100 i 1000 1 -11 - 6- 11 2 2 5 1 10000 FREQUENCY IN HERTZ

oSTONv P&'eLIC

Z/6,eARY

TEsT

/

-

9-27-72Z

/A-5/DC //WcoRNER oF S6EVCNTH FLOR.

GClc.

/O

/oc

7c

7o, ct 0 w z zLUA >-z co 0

56

---

K

2---OA

1 1 1 1 1 1

(38)

37 -BAND NO. 16 17 18 19 20 21 22 ~I~ 23 24 25 26 27 28 29 Ii z R a C 30 31 32 33 34 33 36 37 38 39 40 41 42 - - -~ ~

I

It

*11-I

--i-~-

-I-t-I

~ - ~- -4,-/ co 0 co U

z

z

c4 L-I-, 100 2 1000 2 10000 FREQUENCY IN HERTZ 00.5701 IeLIC -/8ARY

TE5S

T

2O o

-

2 7-72

F1i/

/00

?0

80

7b

~- tin--- - - -~.

I

~

Ii

~

- -- -.- ~

{

Ii

I

1 - -..--. ~-

I

-+-.-- -~

I

-40-30-62-80-100-- 123-160-200-250--375-400-500-630--800- 100-125-160-200-250-315--400-500-630-800-100--- I I I I I II

125-5E~]~KK

-

-K HH~

'Th/ Und

5So

~Iz

1 1 1 74 1 1 1 / '\ z .ZEV~eNTA

(39)

741-- 38

-levels present in- the entrance hall, something has to be done about the levels inside the corner shaft areas.

Two of the shafts have fan inlet ducts terminating about

5 ft. above the floor level and one shaft has the inlet side

of the fan flush with the shaft wall. This latter fan has a rubber vibration isolation connection which should be changed

to some material with a higher transmission loss coefficient.

For the two shafts where the inlet ducts terminate 8 to 10 ft. below floor level, it was suggested to cover the shaft walls by adhering an acoustical absorbing material such as

"Ultra-liner" to the shaft walls about

5

or 6 ft. above and

below the duct termination. This could also be accomplished

by spraying the shaft walls with an acoustical absorbing

material.

For the two shafts where the inlet ducts terminate above

floor level, the ducts could be extended into the shafts and

treat these two shafts as the other two. Another possibility

is additional attenuators on the inlet ducts.

Sam Rogers suggested a steel covering over the shafts. This is a good possibility and if used, it naturally entails

extending the overhead ducts into the shaft and acoustically

sealing all cracks around the

ducts-By incorporating some of the remedial suggestions, the

levels on the ground floor near the entrance should be reduced

sufficiently so that the fans on the seventh floor could not be heard.

C-1-0 - 7 72

(40)

-- 39

-BASEMENT EQUIPMTFENT ROOM

The levels in the basement equipment room are generally

high (88 dBA) and peak much higher (98 dBA) depending on the

distance from the outlets of fans and/or other equipment. The room is actually a collection plenum for return air and

the fans return air by discharging directly to the room with

nothing on the outlets.

These high levels within the equipment room do not present

a problem because there are no personnel regularly assigned

to this space.

Fig. 12 is the sound pressure spectrum about 35 ft. in front of the outlets of RAF-7 (48B7) and RAF-8 (48B7). RAF-9 (48B7)

returns air perpendicular to RA.F-7 and 8 about 28 feet away. Fig. 12 shows thehLghest levels at frequencies from 500 to 2500

Hz. This is cuused by a mixture of sound from the fans and miscellaneous equipment.

Fig. 13 is the sound pressure spectrum taken in between

air conditioning cabinets

5

and 6. The

500

Hz "spike" is due

to the blade frequency of SAF-18 (25A9) on AC-6 and SAF-14

(25A9), 15 (25A9), and 16 (29B9) on AC-5. This tone is leaking through the rubber vibration isolation connections

on the fans and is present in the area It was previously

suggested and reiterated here that the connections could have

been an acoustical type or wrapped with lead impregnated vinyl

to reduce the amount of noise leakage.

72-57

A110-27-7

(41)

-

40

-18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

EIE1~I I I ~ I I

t

11

~ I I

-~-.-t-.-= 14~

11

I

It [

It

z 0o 0 .-C

~

4 ~

Lii2-co 0w

z

-J LE

z

I-ui

9

co 2 1000 2 10000 FREQUENCY IN HERTZ

3OS TON PUBL/C /RARY

Tesr

/-

-27-72

LOASEA7EA'T

EQURP-wrE/VAOA

/VEAR OooR OF AC-6

RE'1E5, ZI2/M4cq W.0

/76. ~

BAND NO. 16 17 /00 I I ~

f

F

GA

I.4--p II r-40- )0-20-31-460-60-W -Iol510202035-0-0-3-0-0>-?: 7c

6c

50 100

(42)

- 41 19 20 mix' 2)8 ,9 3tf 3132 33 34 35 36 37 -) " -,0 31 -2 33r 3

f 11 ~

38 39 40 41 42 ______1___1___7 tt T --i z I-C -0. ut I t 1 ~zziztzz~zziuii i i- i }i i + e 0 Lu w co a

z

-j LUJ 0

z

Lu I-C? 5 1 100 2 1000 2 10000

OA

3

0s TO/V

UL/.8L.iC

FREQUENCY IN HERTZ

.//RARY

TEc5T

2 -

-7

&ASEMENr

EqiPM5,V-BETW45EN

A

C -- AN

AC>

fi e Rl

6

/llvelcl-

DWG. 9

~

o-/13

AND NO. 16 17 18

Wt

/00

rNK

111~4.A

I.- i.I.K -- t

I

I ZIZZZ0-2-702020-7-0-00608010-2-6-202035- -W 60 "-0-15

70

6o

i

i! 2)1 -A "3 )4 -) it -) .7 "

(43)

- 42

-LIBRARY EXTERIOR

Some minor complaints have been received from a hotel

across the street behind the library. The levels present

behind the library are a result of the upstream noise of the

fans on the AC units in the basement. The sound is traveling

through the cabinets, out the fresh air intake louvers, and up to the street.

Figs. 14 and 15 are the tests taken inside AC-5. These

air conditioning units have four fans drawing from a common plenum and the units are equipped with charcoal filters

which provide some sound reduction across the filters.

By comparing Figs.

14

and

15,

we see a significant re-duction of sound levels across the charcoal filters with the most reduction at frequencies of 630 Hz and higher.

The "spike" in Fig. 15 is the blade frequency which is

radiated through the fresh air intake louvers up to the street behind the library.

Fig. 16 is the sound pressure spectrum at the inlet

louvers of AC-2 in the seventh floor equipment room. This

figure should be similar to Fig. 15. A comparison of the

two figures show them to be very similar in both level and frequency distribution.

The sound at street level could hardly be called

objection-able but this could have been eliminated by our original

suggestion of "Acoustilouvers" in place of the standard

louvers.

(44)

-4 3

-Figs. 17 and 18 are the sound pressure levels on the

street behind the library. Fig. 17 is directly over the

grating and the 500 Hz blade frequency of the fans is

notice-able but not predominant. Fig. 18 is a test taken across

the street in front of the hotel. This shows a rapid decay

of the sound level as a function of distance.

FRIEDMAN HALL

Fig- 19 is the sound pressure spectrum in Friedman Hall at about the center of the room. This test was taken because a tone was audible as I passed through on my way to the ground

floor. The tone detected is at 500 Hz and is the blade

frequency of the fans on the AC units in the basement. This

tone is traveling through the upstream ductwork and out the

ceiling louvers into Friedman Hall. The 500 Hz tone is not

at a high level but is easily detectable by the human ear.

At present, without all the shelves and books in, Friedman Hall meets the NC-50 curve but this would be expected to

im-prove slightly when the room is finished.

Signature redacted

HOWARD FENR Research Department

Signature redacted

Approved: irector of Research -7

L1o

-27-72

7

(45)

- 44 BAND NO. 16 17 18 19 20 21 22

EE

'tilt' 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 I- -I- \- t Il[ A

KI

I 38 39 40 41 42 El a z 0 0 a-. a a C

NJ

0 u 0

z

.- j I-100 2 1000 2 10000 FREQUENCY IN HERTZ

Bo5

TO

N

AueLC

L/RARY

/tsivE

/YC-5

8E7h/EE/V

F/LT ERS AND EA/ /NVLE 77.

2EFER L/8A~CH OWG. o-D'4

F1G.

/4

/00

-~ If I -

[~f ]{

~ I [

Liii iIj~ I-.

i

r

_ 1 4 Ii I

I

-~

I ~ I I ~ I I

-

t I

____ ____

0A

I L

~

I

-~~~~

iIIi--t

'A I_ -~~ I 1 i -~~~~~~~ ~ ~ AL

1-t

i--i----i-r=; -- -i3--8-700-15-160-60-2 03i5-4 0-560-'30-i -1'-1 -76-0-203*-0-0015

9o

~C. 0

i i

. ! i i i i i i i . . . . . . . . i !--- 1 1 1 1 1 1 1 1 1 1. . . . . . . I I L --- I t.

I

~

.

~ ~ ~

1

(46)

-

45

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 El 0n 2 C

K

100 2 1000 2 10000 FREQUENCY IN HERTZ

,BOSTON

uLIC

L/

TEsr

4 -

-27-22

/1Vsc1,E

AC-5

BE76TIEA

F/- TERS A/vo /NTAE K,0&VERS.

2CEFER

d/MA-7cA DW 5-D-BAND NO. 16 17 1 19 20 21

/00

90

7c

co 0 w z

-z

I 0u - -< "-~

~jY1-1-f--

-1 -~ti- I ~ F

~ I ~

- -~-.- I --

[

~

j

1

1'---t -

-I

~

I -~1 1 1 1 -~- I

~ I

___ "+Lt ___

t ~ ~ t

it

I

40-5O-62----80 -1 I I I I I I 00- I 125-160-200-250-315-400-500-630-800- ~

6-I

(47)

- 46 -El a $AND NO. 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 11 1 - II

g

m/oo

o 000 co 0 2 0 a

z

21,

7c,

70 100 2 1000 2 10000 FREQUENCY IN HERTZ 305

TON P

1L/

/RAsRY

?~E7,T

E

-

-2

7-

?Z

SEVENTI/

Fzoo,5

E

M ,pNA

wrkc/

AT

/Nz47T /ouvCRS To A C- 2

REFz.ER

1-1/-iACy ov4G.

D-7-5

/~

- - - - - - - -

-zz~

CA

zziA,

111---

1_

(48)

.

L7

-K' CAC 0 z

R co

a0 80

L-z

-LJ w

co

~4-o BAND NO. 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 3-4 35 36 37 38 39 40 41 42 t t - -~ irntzl: -I- ___

K

iiil* ji

I

- ____ -

1

- .

I

~ ~ ~ -.-

f-

~~-!- i ~-

I

I--f-I I t It~f~ IZ~Z - -f - -*---~-~-+

I

--- I __ __

I

t

t

1

4.--1 -~- 4 -- ~

I

__ ___ I jj

ztz

-40-50-63--80-100-- 125-1 60-200-250--3)5-400-500-630-800- 100-1 25-160-200-250-315---400-500 -6.30-800-100-125-I I I 100 2 2 1000 FREQUENCY IN HERTZ

BOSTON

PuLIC L/S2AP

TEST /1-

--

22-7Z

ABOVE

GRA7T/VC& OVEP /1NLET

LOUVERS 8E/ND 4/RAPRY

F

1

,

/7

'n '

(49)

48 -32 33 34 3.5 36 37 33 39 40 41 42 ii R .0 a 1000 2 10000 FREQUENCY IN HERTZ

B C5s ToN

PUBLIC

/IaARY

T5T

/2

-

-27-72.

ACPR055

S-TREET OPPo06,67E ST //.

FIc,. /8

AMD NO. 15 17 13 19 20 21 22 23 24 ~ 2 7 2 9 3 31

80

70 3c, 0 d u ce o a

z

-s 100

16~~~~

~

171

92

17

32

52

72

93

13

33

53

73

94

- -

-M---

k-.035-0-C)608

50202031--c0c'6-60BW1(-1

A

2

Références

Documents relatifs

To cite this article: Nouran Adel Youssef , Manon Curaudeau , Soheir Mohamed El Nahas , Amal Ahmed Mohamed Hassan &amp; Alexandre Hassanin (2021) Haplotype diversity in

I was then able to make my own observations about the extent of the divergence between Plains Cree relational engagements with place-based entities, and the state’s construal of

Aider votre camarade de la 3e all à résoudre son exercice d’informatique suivant sur les périphériques et logiciels.. Compléter le texte suivant en utilisant la liste

Il convient de préciser, en quelques lignes, l'économie des projets qui ont abouti à la mise en essai, sur cette ligne, d'une locomotive électrique d'un type

Journal professionnel trimestriel édité par le Centre d'Information de la Forge (CIFORGE). CIFORGE est une association loi de 1901, entité de l'Association Française

Rédaction, Abonnements, Publicité, Réalisation Heidi Kopsch, Tél.: 01471764 67 [email protected] Renseignements techniques Fabrice Chevaleyre,. {.chevaleyre.aff@wanado o.fr

Journal professionnel trimestriel édité par le Centre d'Information de la Forge (CIFORGE)-. CIFORGE est une association loi de 1901, entité de l'Association Française

4 MagForge : light weight solutions are available to produce mechanical eomponents..