Social aspects of Total's Lacq CO2 capture, transport and storage pilot project

N/A
N/A
Protected

Academic year: 2021

Partager "Social aspects of Total's Lacq CO2 capture, transport and storage pilot project"

Copied!
9
0
0

Texte intégral

Loading

Figure

Illustration 2: Aerial view of the Rousse 1 CO 2  injection site in 2009, busy with equipments revising  the well before injection (arrow)
Illustration 3 shows the project's timeline, starting from the February 8th, 2007 first press release  [7]

Références

Documents relatifs

During this phase of the project, five sites with a 200 Mt CO 2 potential storage capacity were identified:  2 sites in the Keuper aquifer, one site North of Paris and one

capture at a lower cost and with a higher energetic efficiency than first generation processes using amines such as MonoEthanolAmine (MEA) which are now considered for the first

The condition evaluation results were correlated with the external soil characteristics and internal water quality data, collected through a survey, to identify factors

En effet, les pics les plus intenses observables pour le CuO à des valeurs de 2Θ de 35,5 ° et 38,7 ° correspondent à la phase CuO monoclinique à base centrée décrite par la

Heatmaps within each group of hotspots with similar numbers of CpGs revealed also that for a given CpG content, the 5hmC level correlated with the PRDM9, H3K4me3, and DMC1

The first round robin test was performed on solvent matrices, the analytical methods of the participating laboratories were compared using synthetic spiked samples and real

CO2 capture, transport and storage research facilities from the French node of ECCSEL avail- able for access by the European scientific community.. 9th ”Trondheim Conference on

Soil- Gas Concentrations and Flux Monitoring at the Lacq-Rousse CO2-Geological Storage Pilot Site (French Pyrenean Foreland): From Pre-Injection to Post-Injection... applied