Méthode heuristique d’optimisation stochastique de la planification minière et positionnement des résidus miniers dans la fosse
Texte intégral
Figure
Outline
Documents relatifs
(i) the first remaining unscheduled job is inserted in the partial sequence in order to minimize the partial makespan (same strategy than NEH) and (ii), an iterative improvement
For each instance of the problem, we chose seven val- ues of model parameters for each of the N products: mean demand per period, its variance, lost sales cost, holding cost,
The unrelated parallel machines scheduling problem is that of scheduling without preemption n jobs available at time zero on m unrelated machines to minimize the makespan
Consequently, every elementary network within the whole network détermines a mean delay that has to be added to the project duration estimation obtained by the conventional
United Nations Environment Programme (UNEP), http://apps.unep.org/publications/index.php?option=com_ pub&task=download&ile=012131_en (2016)... he limits of bioenergy
The online stochastic algorithm described in this paper draws inspiration from the primal-dual algorithm for online optimization and the sample average approximation, and is built
Table 1 summarizes the results of the experiments: the first column describes the performance metric, the following 5 columns report the results for the 5 different
Dans ette étude, nous intégrons es deux phases de déision et proposons.. diérentes méthodes pour résoudre le