• Aucun résultat trouvé

10/82

N/A
N/A
Protected

Academic year: 2022

Partager "10/82"

Copied!
16
0
0

Texte intégral

(1)

ADVANCED TERMINAL PROCESSOR DSN/ATP

INSTALLATION MANUAL SUPPLEMENT

PART NUMBER: 30145-90006 PRINT DATE: 10/82

(2)

I NOTICE • 1 '!'he intonaation contained in this docwnent is subject to change 1

1 without notice. 1

1

1 BEWLBTT-PACKARD MAKES NO WARRANTY OF ANY KIHD WITH REGARD 1 1 '1'0 TIllS MATERIALt INCLUDINGt BUT NOT LIMITED TO, TIlE IM- 1 1 PLIED WARRAITIES OF MERCHANTABILITY AND FITNESS FOR A PAR- • 1 TICULAR PURPOSE. Hewlett-Packard shall not be liable tor 1 1 error. contained herein or for incidental or consequential • 1 damag.. in connection with the furnishing, performance or 1

1 use ot this material.

1

1 Hewlett-Packard assumes no responsibility for th use or • 1 reliability ot its software on equipment that is not fur- I 1 nished by Hewlett-Packard .

1 Thi. document contains proprietary information which is 1 protected by copyright. All rights are reserved. No part 1 ot this document may be photocopied, reproduced or translat- 1 ed to another program language without the prior written 1 consent ot Hewlett-Packard Company.

Copyright 1982 by HEWLE'rl'-PACKARD COMPANY

(3)

PREFACE

This manual contains supplementary installation and servicing informa- tion for the Advanced Terminal Processor (AT?) and should be used in conjunction with the Advanced Terminal Processor (DSN/ATP) Installation Manual. 30144-90002, here atter referred to as the ATP Installation Manual. It was written tor the HP service engineer with the assumption that the reader has a good working knowledge of the HP 3000 syste. en- vironment, and is specifically trained in installing HP 3000 products.

The contents of this manual will eventually be added to the ATP Installation Manual.

(4)
(5)

CONTENTS

SECTION I - GENERAL INFORMATION INTENDED PURPOSE OF THE MANUAL. . EQUIPEMENT SUPPLIED . . . • SECTION I I - I NSTALLATION

. 1 . 1

UNPACKING AND INITIAL INSPECTION. . . 3

POWER REQUIREMENTS. . . • . . . 3

ATP THUMBWHEELING SETTINGS. . . • . . . . • . . 3

HARDWARE INSTALLATION PROCEDURES FOR THE SERIES 64. . 3

Installing the SIB. . . • • . . • . . . 4

Installing the AlB. . . • . . . • • . • . 4

Installation or I/O Side Panels . . . 4

HARDWARE VERIFICATION PROCEDURES. . . 8

SOFTWARE INSTALLATION PROCEDURES FOR SERIES 64. . . . 9

SOFTWARE VERIFICATION PROCEDURES. . . • 9

(6)
(7)

SECTION 1 GENERAL INFORMATION

INTENDED PURPOSE OF THIS MANUAL

The intent of this manual is to assist the HP service engineer in in- stalling the ATP subsystem into a Series 6~, and, in particular the pre-assembled ATP Junction Panel hardware where, the installation of the pre-assembled ATP Junction Panel is not covered in the ATP

Installation Manual.

EQUIPMENT SUPPLIED

In order to purchase an ATP subsystem, the customer orders one (1) HP 30144A (which is the HP3000 System Interface Board (SIB», and any combination of the the 30145A's and/or 30155A's (Direct Connect or Modem Connect Port Controllers, respectively).

Each one of the Port Controller products (30145A or 30155A) contain:

o One (1) Asynchronous Interface Board (AlB)

o One (1) Mother Board (either Direct Connect or Modem Connect o From three (3) to six (6) Mini Boards

o One (1) AlB to Junction Panel Cable

The SIB and the AlB's are installed in the I/O Card Cage of the Series 64. The Mother Boards and Mini Boards are installed in the I/O Side Panel which is sheet metal composed of several cutouts, and, is remove- able from the I/O Card Cage. The AIB/JP cable connects the Junction panel hardware (Mother and Mini boards) to their respective AlB.

For ATP add-ons, all of these parts arrive individually boxed and must be assembled on site using the procedure found in the ATP Installation Manual.

For HP 3000 Series 64 installations the SIB and the AlB will still ar- rive separately boxed. However, the Mother Boards and Mini Boards and the AIB/JP cable will be pre-assembled into the I/O Side Panel, in the factory, then boxed as an assembled unit. Therefore, what is actually shipped to the customer's site will be the SIB, the AlB's and a preas- sembled I/O Side Panel containing the number of Mother and Mini boards

1

(8)

ordered under products 30145A and 30155A.

Also included with the pre-assembled I/O Side Panel will be the cable trough which will need to be attached once the I/O Side Panels are in- stalled.

+---+

IHOTE: The mother board and mini boards assembled for AIB '0 I Iwi11 not have an AlB/3P cable attached. The cable for this AIBI lis special and is shipped with the Series 64. Instructions fori lit. attacbaent are included in this document. 1

+---+

For a complete list ot parts and their respective part numbers, refer to the ATP Installation Manual starting on page 1-1.

2

(9)

SECTION II INSTALLATION

WARNING

ALL ACTUAL WORK ON THE SYSTEM OR JUNCTION PANEL HARDWARE MUST BE DONE WITH SOME FORM OF ESD PROTECTION. YOU MUST BE GROUNDED TO THE SYSTEM WITH A WRIST STRAP OR OTHER FORM OF GROUNDING TO PREVENT ESD DAMAGE.

UNPACKING AND INITIAL INSPECTION

Follow instructions starting on page 2-1 of the ATP Installation man- ual. In addition, please use the "CHECK LIST" form (30145-90007), shipped with this product, to verify the arrival of all necessary parts.

POWER REQUIREMENT VERIFICATION

Follow instructions starting on page 2-2 of the ATP Installation Manual.

ATP THUMBWHEEL SWITCH SETTINGS

Follow instructions starting on page 2-3 of the ATP Installation Manual.

HARDWARE INSTALLATION PROCEDURES FOR THE SERIES 64 The following major components are to be installed:

o System Interface Board (SIB) (either 1 or 2) - to be installed in the Series 64 I/O Card Cage.

o Asynchronous Interface Board (AlB) (lor more up to 12) - to be installed in the Series 64 I/O Card Cage.

o I/O Side Panels - to be installed in the side opening of the I/O Card Cage.

o Cable Troughs - to be attached to the I/O Side Panels.

Installing the SIB

In the Series 64 environment there can be more than on~ ATP subsystem, thus there can be more than one SIB. Since the SIB must be able to

3

(10)

co..unicate with the CPU via the Inter-Module Bus (1MB) it must be' physically inserted in a slot ot an active 1MB (the I/O card cage of a Seri•• 64 has two 1MB's). The AlB's, on the other hand, only require power trOll the I/O card cage backplane. Therefor., if more than one

(1) SIB i. to be shipped to the customer's site, the factory takes the liberty ot as.~ingthat both SIB'. are 'to re.ide in 1MB

'1.

In this

instanc., SIB

'1

will only have tour (4) AlB's associated with it and SIB

14

will have the remaining AlB's assoicated with it. Making this a••umption allows tor a variety ot combinations ot GIC's, INP's, Trans- lator PeA'., SIB'., and AlB's, such that both SIB's can communicate

u.

in. 1MB 11.

Follow instructions starting on page 2-14 ot the ATP Installation Manual tor each SIB that is to be installed.

Installing the AlB

Follow instructions starting on page 2-16 of the ATP Installation Manu- al. Note: In the instructions there is a NOTE in step C. IGNORE THIS NOTE. The "Installation of I/O Side Panels", immediately following, replaces the Direct and Modem Port Controller installation procedures in the ATP Installation Manual.

Installation ot I/O Side Panels

There are two I/O Side Panels to be installed; where, the first side panel is to be placed in the lower opening of the side of the I/O card cag. and the second side panel is to be placed in the upper opening of the side ot the I/O card cage (refer to Figure 2-1 for orientation).

Figure 2-2 provides a view ot an I/O side panel with correct orienta.- tion previous to inserting into the I/O card cage side openings. Keep- ing these two figures in mind, perform the following procedure:

1. Determine which of the two side panels is the first side panel by o locating the system console ATP junction panel which will have the first mini board (located top left) marked as shown below,

HP *,OOfM

(11)

2ND Panel (upper)

1ST Panel (lower)

REMOTE

M CON~Le.

DCu

JUNCTION 'ANEL M

9)

CAlLE ,.,.OUGH

)

-~

-

0

TO

000

MODE

ITJ00 @ @ ® 0

TOMODE

[!J[!]§]

PORT

I - r-"

ml2JE!l

0 0 0) 0

CAlLE TROUGH

CAlLE TROUGH

System Console

(2) CD CD CD

:...

G G 1 1 1 1

Full Full

I I

3

j j

3 Blank Blank

@

C C

@

28XXLPINP 2IXXLPtN' ~ RESERVED

B B B

FOR I/O

LK LK LB LK

@ @

K I ..

\, T

,

CAlLE TROUGK

RESERVED FOR

""---- H'" CONNECTIONS

note that

if

the System Console ;s

~~dem

hardware it will take up both slots 1 and 2.

Figure 2-1 Series

64

I/O Card Cage Side Panel

5

(12)

IG a FULL

BLANK JUNCTION

'ANEL

o o

MODEM 1113)

....,NTER

(1/3)

o

o

IN' COMMON

(/3)

o

"".

UI3)

GIC

1/3 BLANK

o o

Plgure 1-2.

Junction Panel and Mounting Plates 6

(13)

o assuring that the AIB/JP cable is not attached for this junction panel assembly (this junction panel will be using the DCU AIB/JP cable shipped with the Series 64),

o and, assuring that the bottom row or cutouts contain "1/3 BLANK"

cover plates and "FULL BLANK" cover plates, which will be re- moved later in order to insert HP-IB junction panel connections.

2. Run AIB/JP cables through the I/O card cage lower opening and then to the right such that the AIB/JP cables now protrude out the rear of the Series 64 I/O card cage (Refer to Figure 2-7 of the ATP Installation Manual).

3. Seat the I/O Side Panel appropriately and attach to the opening with the 12 screws provided (P/N 2680-0274) and 12 washers (P/N 3050-0226) (3 for the top, 3 for the lett side, 3 for the right side, and 3 for the bottom).

4.

Remove the mini boards for the system console junction panel. If console junction panel is a Direct Connect then remove the left most and the middle mini boards. If it is a Modem Connect then re- move the mini boards marked "PORTS 4/5, and 6/7.

5.

Locate the mother board end of the DCU AIB/JP cable (it should be already attached to the DCU and to the rear of the Remote Console Modem port (See Figure 2-8 of the ATP Installation Manual).

6. Insert the mother board end of the DCU AlB/JP cable through the cable opening made by the bottom of the mother board and the lower card guide and attach with the screws provided (2200-0514).

7. Re-insert the system console junction panel mini boards and attach with the earlier removed screws.

NOTE: It is possible that there will be no ATP junction panels pre- assembled into the Second I/O Side Panel. If so, merely install the second I/O Side Panel as per step 3.

8. Run the AIB/JP cables of the Second I/O Side Panel through the upper opening of the side of the I/O card cage and then to the right such that these cables also protrude out the rear of the I/O card cage.

9. Attach the second I/O Side Panel as in step 3.

10. Locate the AlB end or the DCUAIB/JP cable for the system console junction panel and attach it to the AlB 10 that is connected to SIB 11.

7

(14)

11. Attach the Cable Troughs. (quantity

4,

2/panel) in the locations shown in Figure 2-1 with the screws (~/trough) PIN 2510-0301 and washers PIN 3050-0139 provided.

lOT!: The AIB/JP cables should not have been connected yet. This ommision is necessary to facilitate the following verification pro- cedures.

HARDWARE VERIFICATION PROCEDURES

Follow instructions starting on page 2-24 of the ATP Installation Manual with the following exceptions:

Step F should read "Plug the console into port 0 of AlB 0."

In addition, specifically perform the following ATPDIAG testing:

1. After loading the DUS and receiving a prompt enter ATPDIAG

to start A7P diagnostic testing.

2. Using the ATP Offline Diagnostic Manual PIN 30144-90003 as refer- ence, run all the SIB tests (outputting the results to the

line-printer) for a total of 10 times on all SIB's installed.

It the SIB testing passes, perform the remaining steps. If the SIB testing does not pass, replace the appropriate SIB and repeat this step.

3. Now setup a test to perform all tests, except Loopback, to every AlB installed in the 1/0 card cage by entering,

ALL N (indicates all testing is to be performed except loopback) It the AlB testing in this step passes, perform the remaining steps. It the testing does not pass, replace the failing AlB with a known good AlB and repeat this step.

4. Perform loopback testing for all AlB's except AlB '0 remembering to tlip the POWER switch on the AlB to its OFF position and ON position every time you remove and replace hood connectors including loopback hood connector) from the front plan of the AIB's. To do this, use the AlB Loopback Connector PIN 301~5-60005.

It an AIB tails this test, replace it and repeat the test. If it passes, continue with step 5.

5. Connect all AIB/JP cables to their respective AlB's, remember- ing to place the POWER switch in the OFF position first.

8

(15)

6. After placing the POWER switches of all AlB's in their ON position, perform a manual selftest of the MSC chip on all Modem Mother

PCA's. The switch for this purpose is on the back upper left of the Mother board and is accompanied by an LED. Pressing this mo- mentary switch will cause the self test to execute.

It the self-test passes, continue with step 7. If this test fails, either the Modem Mother board can be replaced, or the ports

connected to this mother board cannot be used with modems but can be used with direct connected terminals (not recommended).

7.

Perform loopback testing out to each port by first placing an ap- propriate loopback port connector on the port to be tested.

NOTE: A set of these loopback connectors should have been shipped with the system so that you can test more th~ one port at a time.

They can be located in the Support Log.

If any port fails loopback testing on AlB's other that AIB '0, then a problem exists with either the AIB/JP cable, the mother board, or the appropriate mini board. In the case of a direct connect junc- tion panel (RS232 3-pin) its probably the mini board). If it is a direct connect (RS422 5-pin) port, the problem could be the AIB/JP cable or the 12 volt power supplied by the AlB. If the port is a modem port, the problem could be the 12 volt supply, the AIB/JP cable, the mother board, or the mini boards.

Replace the failed module.

If a port fails on AlB

'0,

you may have to swap in a known good AlB to verify that the AlB is not at fault. In this instance, the Series 64 I/O Card Cage must be powered down. Therefore, you will have to reload the DUS and setup testing for just this particular AlB as in steps 3 and 4. If the original AlB '0 passes, then, the problem is in the junction panel assembly connected to AlB

'0.

SOFTWARE INSTALLATION PROCEDURES FOR SERIES 64

Follow the instructions starting on page 2-27 of the ATP Installation Manual. Hote that this part of the installation procedure is usually performed by the SEe

SOFTWARE VERIFICATION PROCEDURE

Follow the instructions starting on page 2-30 of the ATP Installation Manual. Note that this part of the procedure is usally performed by the SE.

9

(16)

Références

Documents relatifs

Bravo à ceux qui ont osé proposer leurs clichés mais je vous rappelle que c'est une présentation de photos d'amateurs sans concours qui met en valeur une facette de notre commune .Je

Writing your own kernel module There might also be applications where you want to read data from your hardware at each interrupt and buffer it in a piece of kernel memory

ON THE UNSYMMETRICAL TOP... On the Unsymmetrical

Data 1/0 has become the world's largest supplier of microcircuit programming equipment by working closely with you and the people who design and manufacture the

Since the Super I/O incorporates the standard PC-XT and AT decode logic, this demo board supports the I/O address- es used in the PC-XT and AT for the serial port, parallel port,

Address lines AO. A 1 and A2 select one of eight Port addresses. One input port and one output port reside at each address. The RO- and WR- inputs control the

Measurement Bus (CMB), you can start and stop up to 16 emulators at the same time, and you can use the analyzer in one HP 64700B to arm (that is, activate) the analyzers in other

Position the flat end of the looped trigger rod under the flat end of the bait pan trigger, so that both doors are held open and the bait pan is level (illustration 3) 6.. Turn