RESEARCH OUTPUTS / RÉSULTATS DE RECHERCHE

Author(s) - Auteur(s) :

Publication date - Date de publication :

Permanent link - Permalien :

Rights / License - Licence de droit d’auteur :

Bibliothèque Universitaire Moretus Plantin

Institutional Repository - Research Portal

Dépôt Institutionnel - Portail de la Recherche

researchportal.unamur.be

University of Namur

Strengthening Employee's Responsibility to Enhance Governance of IT - COBIT RACI

Chart Case Study

Feltus, Christophe; Petit, Michaël; Dubois, Eric

Published in:

Proceedings of the the 1st ACM Workshop on Information Security Governance (ACM WISG 2009), Chicago, Il,

USA

DOI:

10.1145/1655168.1655174

Publication date:

2009

Document Version

Early version, also known as pre-print

Link to publication

Citation for pulished version (HARVARD):

Feltus, C, Petit, M & Dubois, E 2009, Strengthening Employee's Responsibility to Enhance Governance of IT

-COBIT RACI Chart Case Study. in Proceedings of the the 1st ACM Workshop on Information Security

Governance (ACM WISG 2009), Chicago, Il, USA. ACM Press, Chicago, USA., pp. 23-32.

https://doi.org/10.1145/1655168.1655174

General rights

Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. • Users may download and print one copy of any publication from the public portal for the purpose of private study or research. • You may not further distribute the material or use it for any profit-making activity or commercial gain

• You may freely distribute the URL identifying the publication in the public portal ? Take down policy

If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim.

(2)

Strengthening Employee’s Responsibility to Enhance

Governance of IT – COBIT RACI Chart Case Study

Christophe Feltus

Public Research Center Henri Tudor Luxembourg-Kirchberg, Luxembourg PReCISE Research Centre, Faculty of Computer Science, University of Namur, Belgium

[email protected]

Michaël Petit

PReCISE Research Centre, Faculty of Computer Science,

University of Namur, Belgium

[email protected]

Eric Dubois

Public Research Center Henri Tudor Luxembourg-Kirchberg,

Luxembourg

[email protected]

ABSTRACT

The ongoing financial markets debacle and the global economic context advocate enhancing the governance of the companies and, de facto, improving the elaboration and the understanding of employees’ responsibilities. Furthermore, the moral aspects of the business and the employees’ commitment have appeared as becoming increasingly unavoidable to face emerging ethical challenges. These arising requirements have oriented our research toward the elaboration of an innovative responsibility model built on the concepts of obligation/accountability, right and commitment. This paper aims to present, validate and improve the responsibility model on the basis of a comparison to related concepts from the COBIT framework. In parallel to this improvement, proposals of conceptual modification of the COBIT framework are made and illustrated based on the RACI chart.

Categories and Subject Descriptors

K.6.1 [Management of Computing and Information Systems]: Project and People Management – Staffing, Strategic information

systems planning, Systems analysis and design, System development.

General Terms

Management, Reliability, Security, Human Factors, Theory.

Keywords

Responsibility Model, IT Governance, IT Management, COBIT, RACI Chart, Business Ethic, Employee Commitment.

1. INTRODUCTION

The current crisis has highlighted the necessity for a global rethinking of the economy. Industrial analyses as well as academic surveys have put forward the need for improving the governance of Information Technology (IT) such as the control, the

procurement of and the alignment with the business and the employees’ engagement in more ethics, transparency, accountability and commitment. All of these domains are gathered under the Corporate Governance umbrella and are progressively integrated in standards and norms such as ISO/IEC 38500:2008 [1] that provides principles for the corporate governance of IT, SOX [2] that describes requirements and specific mandates for financial reporting or Basel II [3] that defines rigorous risk and capital management requirements for the banking sector.

In parallel to these newly arising and progressively formalized requirements for improving the governance of IT, companies are used to work with well-known experienced and approved

management frameworks for their day-to-day operations, IT

follow-up activities or investments. These frameworks mostly target a well-defined activity domain or a precise technology, and address the above listed governance’s requirements through a very specific approach and well-defined areas, i.e. COBIT [4], a framework that enables the development of clear policies and good practice for IT control throughout enterprises, IT Infrastructure Library (ITIL) [5], a public library that focuses on IT services management for high-quality service provision, CIMOSA [6], an enterprise architecture model to define industrial computer system architecture or the international standard ISO/IEC 15504 [7] a framework for the assessment of software processes. All of them deal in one way or another with responsibility elements and the consequence of this abundance of frameworks is the existence of an equal amount of responsibility models and interpretations.

Based on the assumption that all of these models are consistently used for the elicitation of corporate rules and policies, it is obvious that defining a common responsibility model among them would quickly bring relevant benefits for the business. Moreover, assuming that these rules and polices most of the time formulate the behavior of a system [8] and of its employees, we deduce that having these responsibility suitably defined represents a paramount significance for the governance of companies.

Assuming the importance of the responsibility concept, the analysis of its representation through professional standards, norms and frameworks as well as the examination of scientific literature highlight, that, as yet, a consensual and common understanding of its conceptual components does not exist. Taking that into account, our research aspires to globally improve the IT governance mainly by advising a common responsibility model dedicated to industrial and scientific usage. This model of

Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee.

WISG’09, November 13, 2009, Chicago, Illinois, USA. Copyright 2009 ACM 978-1-60558-787-5/09/11...$10.00.

(3)

responsibility may later be used to refine the elicitation of pragmatic IT policies such as the access control one.

In this paper, we present the responsibility model and explain some of its most important components in section 2. The research method used to develop this model is a two steps approach. In step 1, we depict the scientific literature in the field of responsibility to identify its main conceptual components. In step 2, we elaborate a UML responsibility model based on the component found in step 1 and we operate successive refinements by comparing it with existing professional management framework.

Afterward, we introduce in section 3 the COBIT’s responsibility elements through a synthetic UML diagram. Then we compare the responsibility model elaborated in section 2 with the responsibility constructs encompassed in that diagram and we advise on some COBIT enhancements according to the most significant responsibility concepts of our responsibility model in section 4.

Finally, in section 5 we illustrate the improvement by analyzing the COBIT’ Identify system owners’ action of PO4 “Define the IT

Processes, Organisation and Relationships”.

2. THE RESPONSIBILITY CONCEPT

The responsibility model (Figure 1) was elaborated through a double activity. First, the theoretical model was constructed based on the analysis of the responsibility conceptual components issued from social [19], managerial [8,16,19,22], psychological [18,24,26,27] and computer science [11,30,31] literature’s incomes. Secondly, this theoretical model was enhanced and validated by confrontation with industrial frameworks. Simultaneously, improvements of these existing industrial frameworks were proposed by adjunction of conceptual components from the responsibility model they lack. I.e. [9,10,12].

Figure 1. Responsibility Model UML Diagram.

The analysis of the responsibility concept [11,12] highlights that there is a plethora of definitions of it. We may however state that commonly accepted definitions of responsibility encompass the idea of having the obligation to ensure that something happens.

2.1 Concept of Obligation/Accountability

Obligation is the most frequent concept that appears in literature

as well as in industrial and professional frameworks. Two types of obligation have been defined by Dobson [13]: functional obligation as what a role must do with respect to a state of affairs (e.g. execute an activity) and a structural (managerial) obligation as what a role must do in order to fulfill a responsibility such as

directing, supervising and monitoring, whenever an obligation or a right is delegated.

Accountability and answerability are closed concepts that are

composed of one or several obligation(s) to report the achievement, maintenance or avoidance of some given state [36] to an authority. The difference between both concepts is that one accountability is composed of one answerability and zero or one sanction [13]. Stahl [14] argues that accountability describes the structures, which have to be in place to facilitate responsibility and that responsibility is the ascription of an object to a subject rendering the subject answerable for the object. Stahl also focuses on the sanction as being of central importance for responsibility. He nuances the sanction as positive or negative. The

(4)

duty to report or explain the action or someone else’s action to a given authority” [11]. There are other definitions of accountability. Laudon and Laudon [33] define this concept in the following way: “Accountability is a feature of systems and social

institutions: It means that mechanisms are in place to determine who took responsibility of actions” with the following definition:

“responsibility has to do with tracing the causes of actions and

events, of finding out who is answerable in a given situation”. For

Goodpaster and Matthews [34] accountability is a mechanism’ set allowing such tracing of causes, actions, and events whereas for Spinello [35], it is a necessary but not a sufficient responsibility condition.

2.2 Concept of right

The concept of right is common but is not systematically embedded in the frameworks. It encompasses facilities required by an employee to fulfil his accountabilities. These facilities could include, amongst others capabilities, authorities or the right to delegate.

Capability describes the possession of requisite qualities, skills or

resources to perform an action. Capability is a component that is part of all models and methods [6,36,37], and is most frequently declined through definitions of access rights, authorizations or permissions [38,39].

Authority describes the power or right to give orders or makes

decisions. This concept is introduced in CIMOSA [6] as the “power” to command and control other employees and to assign responsibilities. CIMOSA argues that responsible employees have rights over resource in the first place and over process, action and task in the second place. CIMOSA distinguishes resources from their capabilities: Resources are companies’ assets required for carrying out processes whereas capabilities are technical abilities provided by a specific resource and are of four types (functional, performance, object oriented or operational).

Delegation right is a type of right to transfer some part of the

responsibility to another employee that pledges commitment for it (Cf. section 2.3). This transfer may concern the transfer of right or of accountability or both. The delegation of an obligation may or may not be accompanied by the delegation of right to further delegate this same obligation [36]. This delegation of rights depends on the right’s type (access to information, money, time…) and on the employee’s status, function or position. This delegation may or may also include not the transfer of obligation as the obligation to be accountable [32].

2.3 Assignment/delegation process

Assignment is the action of linking an employee to a responsibility

and delegation process is the transfer of an employee’s responsibility assignment to another employee.

The commitment pledged by the employee related to that assignment or delegation process represents his moral engagement to fulfill the action and the assurance that he does it in respect of an ethical code. The commitment remains a virtual concept, difficult to define as well as to integrate in a strictly formalized framework. In [16], Meyer and Allen acknowledge that

“commitment should be conceptualized as a psychological state concerned with how people feel about their organizational engagements”. To bypass the integration difficulty, we propose to

integrate in the model the components that enforce the commitment as an alternative solution. These components

traditionally called “Commitment’s antecedent” in the literature correspond to more pragmatic variables [17].

The antecedents may take many forms depending of the type of commitment. These forms are i.e. the characteristics and the experiences that a person brings to the organization [18], age of the employee and the time he is part of the organization [19,20,21], the perception of job security [22], management culture and style [23], the employee’s investments in time, money and effort [24]. A scientific survey of the commitment also highlights that “Commitment outcomes” may really influence the quality and efficiency of the action achieved. Pfeffer in [25] explains that “Employee commitment is argued to be critical to

contemporary organizational success”. Following list

summarized commitment outcomes:

• The employee performance [26]. Committed employees performed better because of their high expectations of their performance. Moreover, employees have a high level of performance when there are committed to both their organization and their profession.

• The retention of the employee. Many studies demonstrate the link between the commitment and the employee’s turnover [24,26,27].

• The citizen behavior or extra-role behavior. The research over these outcomes remain however inconclusive [28].

Based upon the commitment outcomes and antecedent definition, we may assumed that being committed to the responsibility of an action means for an employee on the one hand an increasing of trust in the achievement of the obligation or in the accountability attached to the responsibility, and on the other hand more efficiency (and consequently more capabilities) for this employee to perform the action.

3. COBIT AND THE RESPONSIBILITY

CONCEPT

COBIT Executive Overview [4] describes COBIT as follows:

COBIT is a framework and supporting tool set that allow managers to bridge the gap with respect to control requirements, technical issues and business risks, and communicate that level of control to employees. COBIT enables the development of clear policies and good practice for IT control throughout enterprises. COBIT is continuously kept up to date and harmonized with other standards and guidance. Hence, COBIT has become the integrator for IT good practices and the umbrella framework for IT governance that helps in understanding and managing the risks and benefits associated with IT. The process structure of COBIT and its high-level, business-oriented approach provide an end-to-end view of IT and the decisions to be made about IT

COBIT addresses the responsibility of all roles played by employees involved in IT governance actions. The COBIT responsibility model is formalized through a RACI chart matrix attached to all 34 COBIT processes. RACI stands for Responsible, Accountable, Consulted and Informed and explains what the responsibilities of all employees are regarding the key activities performance. This COBIT responsibility model differs from the

(5)

responsibility model introduced in section 2. To make the difference between both clearer and to discuss it, we introduce a

summarized representation of the COBIT responsibility model including its RACI chart on an UML diagram in Figure 2.

Figure 2. COBIT Responsibity UML Diagram

3.1 COBIT’s Concept of Obligation/

Accountability

COBIT introduces the obligation of employees related to their responsibilities. I.e.: AI6 Acquire and Implement Manage

Changes requests the employee to “Set up formal change management procedures” or DS11 Deliver and Support Manage Data requests the implementation of physical security measures.

The meaning of the Cobit obligation is the same as the meaning of the obligation introduced in section 2

COBIT also addresses the accountability. Accountability and responsibility are both at the same conceptual level part of the RACI chart and consequently, represent both a type of obligation assignment/delegation process to an employee. COBIT defines the accountable as the employee who provides direction and authorizes an action whereas the responsible is the employee who gets the action done. COBIT definitions of responsibility and accountability are closed to the one provided in section 2 and 2.1. However, in our responsibility model, accountability is not at the same level as the responsibility but is a concept that composes the responsibility.

Moreover, it is also possible to understand some other differences and nuances between both concepts by analyzing how they are used in the framework:

• 1st input is the sentence that defines level 2 of the COBIT maturity model: “An individual assumes his/her

responsibility and is usually held accountable”. This

sentence means that it is possible or not to be responsible and accountable at the same time.

2nd input is “IT management has the resources and

accountability needed to meet service level targets”

from DS1, Define and Manage Service level (Maturity Model level 5). This sentence means that accountability is also something that is possessed and as consequence, may be seen as rather a capability (or a right) than an accountability (or an obligation). As it appears this sentence presents the accountability as an authority [25] more than a duty to give account regarding an obligation.

As Fox [14] acknowledges, accountability is partially issued from transparency. By analyzing transparency concept in COBIT, it appears that it is an IT or process goal for about 11 of the COBIT controls. Transparency is however often attached to the understanding of IT costs and to the necessity of IT governance rather than to the individual responsibility.

The concepts of sanction and answerability do not appear in COBIT.

3.2 COBIT’s Concept of right

Our responsibility model is composed of different types of rights like authority, capability or delegation. In COBIT, the concept of right does not really exist but capability, authority and delegation are addressed. Right only appears in the sense of access right like in DS5.3 “Identity Management” or in the sense of rights and obligations linked to a contractual engagement like i.e. in AI5.4

“IT Resources Acquisition”.

The capability concept is defined in the framework as: “Having

(6)

capability is an important concept integrated in COBIT and is related to a process or to an employees’ responsibility.

From the process perspective, the performance of a process is measured based on what the process has to deliver (process outcomes), on how it delivers it (process capability) and on how much it is applied (its coverage). The understanding of this process capability is different from the capability addressed in our responsibility model. The COBIT maturity model is derived from CMMI [29] and is interpreted for IT management processes. For instance: “To respond to the business requirements for IT, the

enterprise needs to invest in the resources required to create an adequate technical capability (e.g., an enterprise resource planning [ERP] system) to support a business capability (e.g., implementing a supply chain) resulting in the desired outcome (e.g., increased sales and financial benefits).”

From the employee perspective, COBIT addresses the capability like it appears in the responsibility model introduced in section 2: capability is linked to an employee and is necessary for him to perform an action. I.e.:

1. ME1.5 Board and Executive Reporting: “Provide management reports for senior management’s review of the organization’s progress toward identified goals, […].” In this case the management report is one capability necessary for the senior management’s review.

2. AI4.2 Knowledge Transfer to Business Management: ”Transfer knowledge to business management to allow them to take ownership of the system and data and exercise responsibility for service delivery and quality, internal control, and application administration processes[…]” In this case the knowledge is one capability necessary for the business management.

Authority is not explicitly defined in COBIT but some sentences

say that this concept may be perceived as a type of capability. I.e. in the COBIT glossary, the accountability refers to the person or group who has the authority to approve or accept the execution of an action. It may consequently be seen as a type of right to approved or accept an action. Moreover, authority is something provided to the person that is responsible. I.e. the action « Assigning sufficient authority to the problem manager” in DS10 “Deliver and Support”

Delegation exists in COBIT and this concept is presented in next

section.

3.3 COBIT’s Assignment/delegation process

Assignment as it appears on Figure 1 exists punctually and in

COBIT it is named allocation of responsibility. Due to the miss of definition of allocation in the framework, this concept refers indifferently to many meanings like i.e. in the attribute of the level 1 of the maturity model of PO5 “Manage the IT Investment” where it corresponds to a type of capability necessary to perform the management of IT actions rather than an assignment of responsibility to an employee. Others types of allocations exist like i.e. the allocation of resources addressed in some section like in DS3.4 IT Resources Availability of DS3 “Manage

Performance and Capacity” or the allocation of capability that

exists punctually like i.e. the budget allocation attribute of level 4

of the maturity model of DS12 “Manage the Physical

Environment”.

Delegation process exists in COBIT but it is not clear how

different it is from allocation. According to what as been found in COBIT, delegation concerned the delegation of responsibility like in level 4 attribute of the maturity model of PO6 “Communicate

Management Aims and Direction” or the delegation of authority

like in PO1.6 “IT Portfolio Management”.

As highlighted in the responsibility model, commitment is an important concept related to the delegation/assignment process. Commitment appears in a number of controls of COBIT but it is not dully defined. I.e.:

• In ME3, the responsibility requirement for being at level 4 is that employees are mindful of their compliance obligations and that their responsibilities are clearly understood. This information is interesting in that it adds a new contribution to the responsibility model that is the understanding of the obligation. This contribution could be associated to a commitment antecedent that contributes to foster the definition of the responsibility and consequently improves the job description and the employee’s commitment antecedents.

In PO6 Communicate Management Aims and Direction: The sentence “A positive, proactive information control

environment, including a commitment to quality and IT security awareness, is established” defines the

characteristics of level 4 of the maturity model of this control.

In PO10 Manage Project, the PO10.4 Control Objective is “Employee Commitment: “Obtain commitment and

participation from the affected employees in the definition and execution of the project within the context of the overall IT-enabled investment programme”. Obtaining commitment according to

section 2 could be interpreted by “activating” commitment antecedents for the employees involved in that control. The issue of that activation is a set of commitment outcomes necessary for the project management.

As explained in section 3, “responsibility and

accountability are defined and accepted” from level 3

and 4 of the Maturity Model. This notion of acceptance is interesting because it introduces a commitment of employees regarding their assignment

Although the commitment concept exists in the framework, it appears selective and is explicitly required only for project management control where it is necessary that employees affected in the definition and execution of the project were committed.

4. ENHANCEMENT OF THE COBIT RACI

CHART

As explained in previous sections, the current representation of responsibility in the COBIT framework may be enhanced regarding the 3 elements that composed the responsibility model introduced in section 2:

(7)

1. The right is an important concept in order to achieve an action or a COBIT control but it is not automatically dully expressed and it is often linked to the global control (like i.e. the process input) rather than to responsibility of a precise action itself.

2. The obligation is spread over all the responsibilities and the accountability is in the RACI chart at the same conceptual level as responsibility. This lack of differentiation between the concepts could lead to misinterpretation such as: “you could be responsible without being accountable”. That means whatever you do, there are no consequences for you. At the opposite: “you could be accountable without being responsible”. In this sense, it

means you might be accountable of something that you are not responsible for.

3. The commitment appears sporadically for some controls and in a global way regarding the engagement of some specific employees. However, it is not adapted specifically for each action. This issue suggests that the commitment is perceived as an organizational commitment rather than as a personal commitment that has to exist for each “action – employee” assignment/delegation process.

Based upon these statements, the RACI responsibility model could be improved by the following way (Figure 3):

Figure 3. Enhanced COBIT Responsibity Model

• The obligation, right, capability and commitment are systematically integrated as components of responsibility.

• The accountability is no more perceived as an attribute that links an employee to an action and that is on the same level as the responsibility but as a component that composes this responsibility.

• The informed component of the RACI chart is no more perceived as a type of allocation/assignment of “role – action” but as a type of right for responsibility.

• The consulted component of the RACI chart is no more seen as a type of allocation/delegation of “role – action” but as a type of responsibility.

5. COBIT RACI CHART CASE STUDY

To illustrate the proposed improvement of the COBIT responsibility model, the Identify system owner’s action of PO4

“Define the IT Processes, Organisation and Relationships” is

analyzed. The RACI chart that concerns this action is represented in Table 1.

(8)

Table 1: COBIT RACI Chart of Identity system owners

Following that RACI chart: The Head Operation (HO) is

responsible; he gets the action done whereas he is not accountable for it. The CIO is accountable; based on the explanation of the accountability in section 3.1, he is answerable to the action and is sanctioned according to the result. In parallel, the HO is responsible but does not have to justify the achievement of the action.

Based on our model, the function of the CIO and of the HO could be clarified: the CIO could have managerial obligations like provisioning the HO with the necessary right to achieve the action, controlling the work of the HO, delegating this action if requested, etc. The HO has Functional Obligations like collecting information on the system, understanding how it is used and affecting responsibilities to subalterns. Based upon the identification of this dual responsibility, we may clarify the concept of accountability: CIO is accountable for i.e. having provided the rights to the HO and the HO is accountable for i.e. having affected responsibilities to subalterns.

The RACI Chart highlights that CFO, Business Executive and Business Process Owner are consulted. According to our model, Consult is a type of responsibility and consequently may be defined based on the corresponding concepts that are right/capability, obligation/accountability and commitment. Indeed, to provide the required information, the employee who is consulted needs to have some rights like: access to some information or the right to provide information if it is confidential information. He also has the obligation to provide clear and accurate data and is accountable for that. This last point means that he is answerable and is subject to sanction if the information that he has provided following the consultation is wrong. Moreover, when an employee is affected as a consulted employee, he has to be committed to this responsibility and must consequently have commitment antecedents activated.

Finally, RACI Chart designs five peoples informed of the action. Being informed may not be associated to a responsibility in that it is impossible to be accountable or committed to that. Inform or getting information on the achievement of an action is rather to be considered as a type of right for responsibility. Indeed, in the following case study the employee responsible for the Compliance, Audit, Risk and Security needs to be informed of the output of the action to performed others actions he is responsible for like i.e. preparing the list of auditable employees for assessing system performance.

Additionally, right is formulated for the control in a whole rather than to a particular action or for a particular responsibility. That means in our case study that, if we consider the control input of the PO4 control as rights necessary to achieve the actions of the control, these rights are automatically provided to every

employees engaged in the control without distinguishing the action they perform. I.e.: The 10 functions identified in the RACI chart of the Action « Identify system owners » have indifferent access to all inputs of the control. These rules are in opposition to other security rules like the minimum privilege [30] and separation of duties [31].

Concerning the action Identify system owners again, ten people at least are involved but only one could be held accountable for the results. Our model proposed a solution to dispatch the accountability to all employees who assume responsibilities. We finally propose to manage the commitment of all employees when responsibilities are affected or delegated.

6. CONCLUSIONS

Current economic context and ongoing willingness to improve corporate and IT governance of enterprise advocate a strengthening of the definition and acceptation of rules that govern the behavior of a system. Simultaneously, we observe that the responsibility concept is central to these rules but remains whatever moderately and in an unstructured way addressed to professional norms, standards and frameworks.

Consequently, this paper proposes an analysis of the main concepts that compose the concept of responsibility and defines an innovative responsibility model that tends to integrate all of the meaningful analyzed concepts.

The responsibility model is afterwards validated by comparison with the COBIT RACI chart and some improvements are proposed and justified to enhanced the perception of responsibility in this framework: Systematic integration of

obligation, right and commitment as responsibility components, accountability is a component related to obligation and informed

a type of right, consulted is a type of responsibility and inherits of its properties.

Finally, the Identify system owners action of PO4 “Define the IT

Processes, Organisation and Relationships” is analyzed to

illustrate the added value of our proposition in a real context.

7. ACKNOWLEDGMENTS

This research was funded by the National Research Fund of Luxemburg in the context of TITAN (Trust-Assurance for Critical Infrastructures in Multi-Agents Environments, FNR CO/08/IS/21) project.

8. REFERENCES

[1] ISO/IEC 38500 (2008), International Standard for Corporate Governance of IT.

(9)

[2] Sarbanes, P. S. and Oxley, M. (2002) “Sarbanes-Oxley Act of 2002”

[3] Basel Committee on Banking Supervision, “International convergence of capital measurement and capital standards”; BIS; Basel, June 2004

[4] COBIT 4.1, Control Objectives for Information and Related Technology, Information Systems Audit and Control Association.

[5] ITIL (2001), IT Infrastructure Library – Service Delivery, The Stationery Office Edition, ISBN 011 3308930.

[6] Vernadat F. B., Enterprise Modelling and Integration, Chapman & Hall, London (1995), ISBN 0-412-60550-3 [7] ISO/IEC 15504, “Information Technology – Process

assessment”, (parts 1-5), 2003-2006.

[8] Dulay, N., Lupu, E.,. Solman, M., Damianou, N., A Policy Deployment Model for the Ponder Language, An extended version of paper in Proc. IEEE/IFIP International Symposium on Integrated Network Management, Seattle, May 2001, IEEE Press.

[9] Feltus, C., Petit, M., Building a Responsibility Model Including Accountability, Capability and Commitment, Fourth International Conference on Availability, Reliability and Security, 2009, Fukuoka, Japan

[10] Feltus, C., Petit, M., Vernadat, F., Enhancement of CIMOSA with Responsibility Concept to Conform to Principles of Corporate Governance of IT, 13th IFAC Symposium on Information Control Problems in Manufacturing, 3-5/6/2009, Moscow, Russia.

[11] Cholvy, L., Cuppens, F., and Saurel, C., Towards a logical formalization of responsibility, Sixth International Conference on Artificial Intelligence and Law, pages 233-242, 1997.

[12] Feltus, C., Petit, M., Ataya, G., Definition and Validation of a Business IT Alignment Method for Enterprise Governance Improvement in the Context of Processes Based Organizations, 2008 Corporate Governance of IT International Conference, 1-2/12/2008,Wellington, New Zealand.

[13] Fox, J. A., The uncertain relationship between transparency and accountability" (August 1, 2007). Center for Global, International and Regional Studies. Reprint Series. Paper CGIRS-Reprint-2007-2.

http://repositories.cdlib.org/cgirs/reprint/CGIRS-Reprint-2007-2

[14] Stahl, B. C. & Wood, Ch. Forming IT Professionals in the Internet Age: A Critical Case Study" In: Yoong, Pak & Huff, Sid (eds.) (2006): Managing IT Professionals in the Internet Age. Idea Group, Hershey, PA: 120 – 139

[15] Dobson, J. and Martin, D., “Enterprise Modeling Based on Responsibility”, TRUST IN Technology: A Socio-Technical Perspective, Clarke, K., Hardstone, G., Rouncefield, M. and Sommerville, I., eds., Springer, 2006.

[16] Meyer, J.P. & Allen, N.J. (1991). ‘A three component conceptualization of organizational commitment’. Human Resource Management Review. 1, 61-98

[17] Vandenberghe, C., Bentein, K., Stinglhamber, F., Affective commitment to the organization, supervisor, and work group: Antecedents and outcomes, Journal of Vocational Behavior, Volume 64, Issue 1, February 2004, Pages 47-71 [18] Mowday, R.T., Porter, L. W. and Steers, R. M. (1982),

Employee-Organization Linkages: The Psychology of Commitment, Absenteeim, and Turnover. New York: Academic Press.

[19] Buchanana, B., II. (194), Building organizational Commitment: The Socialization of Managers in work organizations, Administrative science Quarterly, 19, pp. 533 – 546.

[20] Hall, D. (1977), Organizational Identification as a function of Career Pattern and Organizational Type, Administrative Science Quarterly, 17, pp. 340 – 350.

[21] Lio, K. (1995), Professional Orientation and Organizational Commitment among Employees: an Empirical Study of Detention Workers, Journal of Public Administration Research and Theory, 5, pp. 231 – 246.

[22] Niehoff, B. P., Enz, C.A., Grover, R. A. (1990), The Impact of Top-Management Ctions on Employee Attitudes and Perceptions, Group & Organization Studies, 15, 3, 337 – 352.

[23] Florkowski, G., Schuster, M. (1992), Support for Profit Sharing and Organizational Commitment: A Path Analysis, Human Relations, 45, 5, pp. 507 – 523.

[24] Blau, G. J. (1985), The measurmement and Prediction of Career Commitment, Journal of Occupational Psychology, 58, pp. 277 – 288.

[25] Pfeffer, J. (1998). The Human Equation. Boston, MA., Harvard Business School Press.

[26] Meyer, J. P. Allen, N. J. (1984), Testing the ‘Side-Bet Theory’ of Organizational Commitment: Some Methodological Considerations, Journal of Applied Psychology, 69, pp. 372 – 378

[27] Porter, L.W., Steers, R. M., Mowday, R. T., Boulian, P. V. (1974), Organizational Commitment, Job Satisfaction, and Turnover Among Psychiatric Technicians, Journal of Applied Psychology, 59, pp. 603 – 9.

[28] Williams, E.S., Rondeau, K.V., Francescutti, L.H., Impact of culture on commitment, satisfaction, and extra-role behaviors among Canadian ER physicians, Leadership in Health Services, 2007, vol. 20, Issue 3, 147-158.

[29] Chrissis, M.B., Konrad, M., Shrum, S., CMMI 2° édition - Guide des bonnes pratiques pour l'amélioration des processus - CMMI (r) pour le développement, version 1.2 [30] Schneider, F.B., Least privilege and more [computer

security], Security & Privacy, IEEEVolume 1, Issue 5, Sept.-Oct. 2003 Page(s): 55 – 59

[31] Sandhu, R.,“Transaction Control Expressions for Separation of Duties,” Proceedings of the 4th Aerospace Computer Security Conference (December 1988), pp. 282–286. [32] Norman, T. J. and Reed, C. 2001. Delegation and

Responsibility. In Proceedings of the 7th international Workshop on intelligent Employees Vii. Employee theories

(10)

Architectures and Languages (July 07 - 09, 2000). C. Castelfranchi and Y. Lespérance, Eds. Lecture Notes In Computer Science, vol. 1986. Springer-Verlag, London, 136-149.

[33] Laudon, K.C. and Laudon, J.P. (1999), Essentials of Management Information Systems, 4th edition London et al., Prentics Hall.

[34] Goodpaster, K.E., Matthews, J.B.Jr., (1982), Can a corporation have a moral conscience ? Hardvard Business Review (Jan-Feb 1982), pp. 132 – 141.

[35] Spinello, R. (1997), Case studies in information and computer ethics, Upper Saddle River, NJ: Prentice Hall. [36] Ian Sommerville, Russell Lock, Tim Storer and John

Dobson, Deriving Information Requirements from Responsibility Models, 21st International Conference,

CAiSE 2009, Amsterdam, The Netherlands, June 8-12, 2009. ISBN 978-3-642-02143-5.

[37] Yu, E. S. and Liu, L. 2001. Modelling Trust for System Design Using the i* Strategic Actors Framework. Workshop on Deception, Fraud, and Trust in Agent Societies Held During the Autonomous, Eds. Lecture Notes In Computer Science, vol. 2246. Springer-Verlag, London, 175-194. [38] Qingfeng He, Annies I. Antón, A Framework for

Privacy-Enhanced Access Control Analysis in Requirements Engineering, REFSQ'03, Austria, June 2003.

[39] Roeckle, H., Schimpf, G., and Weidinger, R. 2000. Process-oriented approach for role-finding to implement role-based security administration in a large industrial organization. RBAC '00. ACM, New York, NY, 103-110.

Figure

Figure 2. COBIT Responsibity UML Diagram
Figure 3. Enhanced COBIT Responsibity Model
Table 1: COBIT RACI Chart of Identity system owners