To: D. Liddle

From: W. C. Lynch

Subject: Status Report for September 78

XEROX

BUSINESS SYSTEMS System Development Division

Date: September 22, 1978

Location: Palo Alto Organization: SDD/SD/SS

Filed on: [Iris]

<

Lynch> September78.Status

Copies: Archives Belleville Bergsteinsson Bewley Clark

Harslem Heinrich Irby Kennedy Lampson

Liddle. Lynch Mendelson Metcalfe Reilly, D.

Sonderegger Szelong Townsend Wallace Weaver Wickham White

Cc: Ayers Bishop Frandeen Horsley Howard

Linden McJones Purcell Redell

Pilot

The release date for Pilot 2.0 is October 30, 1978.

The alpha test release date for Pilot 2.0 is October 2, 1978.

DeSantis LeCesne Reiley, J.

Wick

Lauer

Alto/Pilot will be co-released with Pilot. Not all features of Pilot 2.0 will be supported in Alto/Pilot 2.0.

Staffing and Equipment

A second model 31 has been installed on Dave Redell's Alto. This, together with the use of the double disk on the Sequoia server Alto, is being used for the build of Pilot releases. Pilot cannot be bu ilt on a Single disk Alto.

l11e Alto scheduled for delivery to the Pion~er group on August 4th has anived.

Negotiations are in progress with a candidate for the third Pioneer' req.

Pilot Implcnlcntation

As we approach the alpha test release of Pilot 2.0, we are converting control of the Pilot project from Gantl20.sil to a Pilot task list.

. Pilot 2.0b was released on August 24th. A pre-alpha release was made on September 5th.

Integration of ~111 required components for alpha test has been completed and tested. We are finding only isolated bugs and those at a low rate.

(2)

[Iris]

<

Lynch> September78.Status September 22. 1978 2

Effort must now be concentrated on the deliverable test programs and on release documentation.

Implementation status is as follows:

VFS: complete.

Processes: Integrated and delivered in Mesa 4.0 (No further changes for Pilot 2.0) Pilot/Mesa: complete with Pilot 1.0d

System: completed with Pilot 1.0c Stream: completed for Pilot 2.0 RigidDisk: complete.

StartPilot and the wartscript: complete.

Other: OIS communications ar~ complete.

The microcode exec has been deleted from Pilot 2.0 The RS232C handler has been deleted from Pilot 2.0

DevelopUlent Common Software (DeS)

The Mesa group has implemented a reduced file stream package (not implementing the Mesa System defs module).

A typescript for the display package has been completed using this reduced file stream package.

Greg Shaw has implemented a Mesa System compatible Pilot directory package in consultation with Dave Redell.

A portion of the Xfer trap processing has become a part of DCS.

Pioneer

Work on the Pioneer Design Specification continues. Forrest Howard is implementing the decimal aritilemetic package from the Pioneer Functional Specification as a training exercise.

See the minutes of the Pioneer Team Meetings for more information.

PerfOrIllanCe Evaluation Tools

Development of the performance evaluation tools is complete. Paul Jalics has returned to his teaching duties.

Maintenance of the breakpoint pair .timing facility has been transferred to the Mesa group. This facility will track with the Mesa Debugger.

A portion of the Xfer trap processing has become a part of DCS while the bulk of it is being maintained by tile Mesa group and will track with the Mesa Debugger.

The Logger Functional Spec will become a parl of Pilot 2.0 and its implementation wilt become a part of Pilot 2.0. We are in need of alpha test client~ of this feature (the Xfer trap mechanism is a condidate ).

(3)

[Iris]

<

Lynch> September78.Status

Assignments

Ayers: On loan to tools

Bishop: Continue to work on DataTalk Frandeen: Pioneer design specification Horsley: Pilot implementation.

September 22, 1978 3

Howard: Come up to speed - Pioneer design specification and decimal arithmetic package.

Jalics: Completed duties on September 13th.

Lauer: Pilot implementation.

Linden: Common Software and Data Management.

Lynch: Manage Pilot implementation.

McJones: Pilot implementation Purcell: Pilot implementation.

Redell: Pilot implementation

Snow: Has reported and is directed by Bob Metcalfe.

Références

Documents relatifs

Bishop: Develop requirements and functions for data management leading to a concepts and facilities document and a functional specification.. Aid Richard Moore

1) Test Mesa Development Common Software - we have identified seven modules, described below, which seem to constitute the subset of MDCS that is required for

Bishop: Continue to work on DataTalk Fnmdeen: Start Pioneer design specification Horsley: Pilot implementation. Julics: Implement the performance evaluation

A microcode overlay strategy (e.g. ll1e requirements for Diagnostics mllst be negotiated with the new XBS service organization. The Gateway software will not have

This summary was lIsed by Bi1l Kennedy in preliminary planning for future microcode usage.. I3iIl is working all a memo describing our strategy and Tom is

The requirements of other organizations and product programs, in addition to STAR, make it necessary for us to provide a single focal point for all the

The Star LSI Workstation Goals document sets guidelines for the implementation of a low cost workstation (terminal, processor, and peripherals) for the OIS Star

Ted Linden has been working closely with the DataTalk effort and has been working toward the formulation of technical requirements for a product data management