• Aucun résultat trouvé

The Cyclic Job Shop Problem with uncertain processing times

N/A
N/A
Protected

Academic year: 2021

Partager "The Cyclic Job Shop Problem with uncertain processing times"

Copied!
5
0
0

Texte intégral

Loading

Références

Documents relatifs

Est il possible de montrer que tous les nombres h-champion dont les exposants dans la décomposition en facteurs premiers sont supérieurs ou égaux à 2 sont les cinq nombres tabulés

When it is asked to describe an algorithm, it has to be clearly and carefully done: input, output, initialization, loops, conditions, tests, etc.. Exercise 1 [ Solving

The basic cyclic scheduling problem (BCS) involves generic tasks and precedence con- straints between tasks but no resource constraints are considered.. In this problem, a set of

We propose a branch and bound method that finds the schedule which minimizes the mean cycle time with respect to variations.. We show that the evaluation of a schedule can be

Under suitable boundary conditions and assuming a maximum principle for the interior points, we obtain a uniform convergence similar to that of Theorem 1.1.. Theorem 2.1 below can

Throughout our experiments we suspected that if we adopt a branching rule that considers the jobs in nondecreasing order of time delays, the dominance rules of Lemmas 2.16 and 2.18

As already mentioned, in the case of batch availability it can be préférable to split jobs of the same group, which have to be processed consecutively on the same machine, into two

• The Shifting Bottleneck procedure is tailored for situations where we take the makespan as objective function and cannot be easily generalized for other performance measures, With