A number of R&D decontamination and decommissioning activities were extensively described on a national scale in a project from the Russian Federation, to create a database of

Because of this there is a need to address the issue of assisting the operating organizations in the development and implementation of human resource management policies and

[28] INTERNATIONAL ATOMIC ENERGY AGENCY, Coordinated Research Project on Improvement of Safety Assessment Methodologies for Near Surface Waste Disposal Facilities

The cost of decommissioning should reflect all activities described in the decommissioning plan, for example planning and engineering during the post-operation phases, the

STATUS OF SELECTED RETIRED NUCLEAR INSTALLATIONS CountryOperatorInstallation, locationStatus United KingdomUKAEACulcheth, Cheshire (RC/S)Decommissioning complete; site sold

The report reviews the wet and dry solid waste management practices at the various types of WWER nuclear power plants (NPP) and describes approaches and recent achievements in

This report describes several specific forms of material and waste generated during the decommissioning of some nuclear facilities; they include beryllium, sodium, cadmium,

As published information and guidance on record keeping relevant to nuclear decommissioning is relatively scarce, more attention is needed on the management and organization