FACT SHEET

Name

Environmentally Sound Management and Disposal of PCB in Electrical Systems Budget (07/2007 -12/2008) CHF 812'800 (approx. US$ 625'230) Partners

Ministry of Natural Resource and Environment (MONRE), Ministry of Industry (MOI)

Implementing Agency

Vietnamese Environmental Protection Agency (VEPA) and Electricity of Vietnam (EVN)

Project Location

Vietnam

Background

Background

The Stockholm Convention concerning the Persistent Organic Pollutants (POPs) was ratified by Vietnam in July 2002. The Convention became legally binding on May 17, 2004. Part II of Annex A of the Stockholm convention stipulates that countries must make determined efforts to identify, label and remove from use by 2025 most relevant PCB-containing equipment, and manage those wastes in an environmentally sound manner. Furthermore, the parties involved are requested to report every five years about progress made in eliminating PCBs. According to Article 7 of the Stockholm Convention each country has to transmit its (national) implementation plan to the Conference of the Parties within two years from the date on which this Convention enters into force.

As a consequence, Vietnam finalized its National Implementation Plan (NIP) in 2007. The NIP is based on a National POP

Inventory, which was established by the Vietnam Environmental Protection Agency (VEPA), the lead agency for all matters relating to the implementation of the Convention.

Overall Goal

Overall Goal

• To strengthen local capacities in the comprehensive

environmentally and technically sound management of PCBs. • To support the Government in defining and adopting the

necessary policy and strategy changes for the final elimination of all PCBs.

• To elaborate all necessary baseline data for the formulation of a follow up by Demonstration of PCB Management and Disposal Project of the World Bank.

Environment Management

Environment Management

Switzerland has contributed to the environment protection of Vietnam and quality enhancement of life and health of the people, especially the poor, including vulnerable women and men, through a project on improved hazardous waste management. This project aims at an environmentally sound elimination of PCBs (Polychlorinated Biphenyls), contributing to the implementation of the Stockholm Convention.

(2)

as of Janu

ar

y

2008

SWISS COOPERATION OFFICE FOR THE MEKONG REGION

Hanoi Central Office Building, 16th Floor 44B Ly Thuong Kiet Street, Hanoi, Vietnam

Tel.: + 84 4 934 66 27 Fax: + 84 4 934 66 33 E-mail: hanoi@sdc.net Website: www.sdc.org.vn

Results Achieved and Expected

Results Achieved and Expected

A screening process of the sites is carried out by trained research institutes which are also able to make GC-MS analyses for transformer oils and soils. Results of the process will be collected in a special PCB database which is currently under construction. It is expected that DONREs and other stakeholders like EVN have access to this Database through Internet.

Highlights

Highlights

The project has operated quicker and smoothly. A closer cooperation between national and international experts led to positive achievements which are important for the following-up projects of World Bank.

Contact

Contact

4th Floor, 106 Nguyen Du Street, Hanoi, Vietnam Tel: +84 4 941 0272

Fax: +84 4 942 9796 Email: pcb@nea.gov.vn

Approaches

Approaches

• Capacity and awareness of the governmental institutions concerning PCB and hazardous waste in general will be strengthened during the different project steps. The iterative process between theoretical know-how transfer and practical experience will lead to a well defined policy regarding a PCB and eventually hazardous waste management. • Capacities of experts regarding analytical, handling and elimination of PCBs will be enhanced. Trained experts will be crucial for the

implementation of the nation-wide PCB-elimination and even of an improved hazardous waste management within research and scientific institutions as well as in supervising environmental agencies.

• Technical know-how of the experts must be integrated into institutions. Through the pilot projects a hazardous waste (HW) infrastructure such as certified laboratories, hazardous waste handling companies, certified stocking places, cement plants certified for HW-incineration and other elimination opportunities within Vietnam.

Current Objectives

Current Objectives

• Carry out various screening in sites of electricity suppliers and the strategy of the project for the second year will be decided based on obtained results.

Références

Documents relatifs

To then distinguish between Sperm whales and other moving acoustic emitters (boats or pilot whales), our interface allows to select a detected impulse, and to plot the spectrogram

null is not bound in the heap, or ok_heap_protochain that states that each bound location has a correct prototype chain (the field @proto has thus to be defined for each non-

• Updates in Coq are reflected to OCaml as far as needed so that we can modify the definition of types and functions in Coq (without changing their behaviors) to make it easy to

The comparison of major element composition and total mineralisation of the investigated groundwaters shows that the overall geochemical evolution is similar for waters from

(iii) Price elasticities and market share parameters are the main factors determining the leakage rate for all three types of projects, and the former ones are much more

and only if at the end of a protocol execution either (1) Alice has received her expected evidence of receipt and Bob has received m (as well as the possibly corresponding evidence

However, the presence of bias introduced to the design of an AI algorithm, or other faults introduced during the learning phase that would lead to an unacceptable behaviour of

Our proposed method consists in two steps: 1) establish the correctness of a node’s claimed coordinate by using the Surveyor infrastructure and malicious embedding neighbor