• Aucun résultat trouvé

Research and Education Activities in Electric Power Systems at the University of Liège

N/A
N/A
Protected

Academic year: 2021

Partager "Research and Education Activities in Electric Power Systems at the University of Liège"

Copied!
6
0
0

Texte intégral

Loading

Figure

Fig. 1: Quasi steady-state simulation has been used as computational  engine of a simulator for training system operators to control  transmission voltages

Références

Documents relatifs

To cite this article: Issam Attoui & Amar Omeiri (2014) Contribution to the Fault Diagnosis of a Doubly Fed Induction Generator for a Closed-loop Controlled Wind Turbine

Moreover, for homogeneous platforms, we provide a linear program to solve the problem of optimization of reliability for given bounds on period and latency in Section 5.4.. 2

The objective of this research is to analyze the Production Planning and Control (PPC) as a dissemination tool of the operation strategy in industries that compete in

Abstract—In this paper, we present a new tri-criteria scheduling heuristic for scheduling data-flow graphs of operations onto parallel heterogeneous architectures according to

Furthermore, in the particular case of Gaussian random fields, a more general class of path properties (notably some degeneracy properties involving differential operators) can

In remote interoperability testing, the asynchronous nature of the environment often results in observation problems: The delay in environment inuences the observation order of

L’archive ouverte pluridisciplinaire HAL, est destinée au dépôt et à la diffusion de documents scientifiques de niveau recherche, publiés ou non, émanant des

Dans ce complexe la membrane pare-vapeur et air et l'étanchéité multicouches sont réunis sur le toit incliné, et l'isolant placé au-dessus de cette membrane étanche tel