Research and Education Activities in Electric Power Systems at the University of Liège
Texte intégral
Figure
Documents relatifs
To cite this article: Issam Attoui & Amar Omeiri (2014) Contribution to the Fault Diagnosis of a Doubly Fed Induction Generator for a Closed-loop Controlled Wind Turbine
Moreover, for homogeneous platforms, we provide a linear program to solve the problem of optimization of reliability for given bounds on period and latency in Section 5.4.. 2
The objective of this research is to analyze the Production Planning and Control (PPC) as a dissemination tool of the operation strategy in industries that compete in
Abstract—In this paper, we present a new tri-criteria scheduling heuristic for scheduling data-flow graphs of operations onto parallel heterogeneous architectures according to
Furthermore, in the particular case of Gaussian random fields, a more general class of path properties (notably some degeneracy properties involving differential operators) can
In remote interoperability testing, the asynchronous nature of the environment often results in observation problems: The delay in environment inuences the observation order of
L’archive ouverte pluridisciplinaire HAL, est destinée au dépôt et à la diffusion de documents scientifiques de niveau recherche, publiés ou non, émanant des
Dans ce complexe la membrane pare-vapeur et air et l'étanchéité multicouches sont réunis sur le toit incliné, et l'isolant placé au-dessus de cette membrane étanche tel