• Aucun résultat trouvé

Evaluation of a new decision-aid parameter for job shop scheduling under uncertainties

N/A
N/A
Protected

Academic year: 2021

Partager "Evaluation of a new decision-aid parameter for job shop scheduling under uncertainties"

Copied!
23
0
0

Texte intégral

Loading

Figure

Table 1. Example of a job shop problem
Figure 2. Set of Semi-active schedules.
Figure 3. Disjunctive graph representation.
Table 2 illustrates the computation of the lower bound of all the groups and operations best − case − earliest − completion − times in our job shop example.
+6

Références

Documents relatifs

In quantifying the performance of our proposed criterion (best-case) during the reactive phase of GoPO, we proposed a branching algorithm playing the role of an operator and

Additional information of: labeling and conjugation reactions; UV –vis spectra, Zeta potentials and hydro- dynamic radii of AuNPs with different surface coverage of PEG; flow

Binary Decision Diagrams (BDDs) and in particular ROBDDs (Reduced Ordered BDDs) are a com- mon data structure for manipulating Boolean expressions, integrated circuit design,

In the following, the context of the research problem is described by focusing successively on the road design problem, the scope of the approach and technical assessment of

In [8], [9], we have proposed MiMaReK, a robust design approach combining Kriging- based optimization, one of the most efficient tools in the context of costly evaluations, with

Se la vita liturgica, e la celebrazione dell’eucaristia in modo specifico, sono punto di partenza e di compimento di tutta la vita della Chiesa, allora anche la teologia

Default Graph: The default graph contains triples that encode metadata about each revision: the revision author, the revision timestamp, the id of the modified entity, the

Dans ce chapitre, nous calculons la section efficace non-commutative et non-minimal de la production d'un boson de Higgs suite à la Fusion de deux gluons gg  H  Z ,