• Aucun résultat trouvé

Short-term active distribution network operation under uncertainty

N/A
N/A
Protected

Academic year: 2021

Partager "Short-term active distribution network operation under uncertainty"

Copied!
6
0
0

Texte intégral

Loading

Figure

Fig. 1: Time line of the operational decision problem.
Fig. 3: PDF examples of f g (p| P ¯ ) and f a (p| P). ¯ equal to zero or their technical minimum
Fig. 4: Test-case network topology.
Fig. 5: Forecasts and non-limited realization at the connection to the transmission network.

Références

Documents relatifs

DP Axis Alignment: The chaser spacecraft calculates a path online from its current position to 14 cm in front of the targets’ docking port face while considering the target as

When in- creasing the energy per particle above a threshold amount that we termed ε∗ ∼ 0.1, the system enters a partially disordered phase: particles are nevertheless localized

De acuerdo con el análisis de Pareto de los factores con un mayor efecto negativo sobre la productividad son la concentración de glucosa, acetato de sodio y sulfato de

Être de bons parents, dans le contexte de la GPA, c’est donc aussi être convaincu d’avoir bien agi (et d’en faire la preuve) en s’assurant que la femme-qui-porte soit

While the characteristics of elderly inpatients that pre- dict length of stay, functional decline, nursing home ad- mission, rehospitalizations or short-term mortality have

These results indicate that short-term credit is beneficial for growth of small and young firms, contrary to the provision of long-term bank loans.. This finding can be explained by

La construction d’un cadre formel de traitement spatial des impacts du bruit des transports terrestres sera l’occasion de structurer les apports croisés de l’acoustique et de

To construct David’s dis- tributed social graph, the agent uses the SWoTProfileReaderArtifact artifact (see Section 9.1.2 ) to extract from David’s SWoT profile the metadata required