• Aucun résultat trouvé

Conclusions following the 1st meeting on the possible Belgian involvement in the construction of ESO related instrumentation” .: 2008, , 11 April 2008

N/A
N/A
Protected

Academic year: 2021

Partager "Conclusions following the 1st meeting on the possible Belgian involvement in the construction of ESO related instrumentation” .: 2008, , 11 April 2008"

Copied!
4
0
0

Texte intégral

(1)

11/4/2008

11/4/2008 9th Meeting of the FNRS Contact Group 9th Meeting of the FNRS Contact Group

"Astronomy & Astrophysics"

"Astronomy & Astrophysics"

Conclusions

Conclusions

following

following

the 1st

the 1st

meeting on the possible

meeting on the possible

Belgian

Belgian

involvement

involvement

in the

in the

construction of ESO

construction of ESO

related

related

instrumentation

instrumentation

J.

J.

Surdej

Surdej

(

(

ULg

ULg

), H.

), H.

Dejonghe

Dejonghe

(

(

UGent

UGent

),

),

A.

A.

Jorissen

Jorissen

(ULB), P.

(ULB), P.

Lampens

Lampens

(ROB),

(ROB),

C.

(2)

11/4/2008

11/4/2008 9th Meeting of the FNRS Contact Group 9th Meeting of the FNRS Contact Group

"Astronomy & Astrophysics"

"Astronomy & Astrophysics"

1. BNCA & BNEC reflections

2. 1st meeting of the BNEC Instrumentation Working Group,

held on July 9th, 2007 at ROB

(Herwig Dejonghe, Patricia

Lampens (secretary), Christoffel Waelkens, Alain Jorissen,

Chris Sterken and Jean Surdej (Chair))

a) ALMA project

b) 2

nd

generation VLTI instrument (cf. VSI)

c) E-ELT instrumentation (cf. MIDIR)

3. First meeting on the possible Belgian involvement in the

construction of ESO related astronomical instrumentation,

22nd of February 2008 at the ROB Planetarium in Brussels

(3)

11/4/2008

11/4/2008 9th Meeting of the FNRS Contact Group 9th Meeting of the FNRS Contact Group

"Astronomy & Astrophysics"

"Astronomy & Astrophysics"

Dr. L. Testi (ESO; ALMA project scientist); “Overview of ALMA (the Atacama Large Millimeter Array)”

Dr. P. Andreani (ESO; ARC manager); “Status of the European ARC (ALMA Regional Centers): goals and forthcoming projects”

Dr. B. Brandl (Leiden University; MIDIR PI); “Instruments under study for the European Extremely Large Telescope (E-ELT), in particular MIDIR (Mid-IR spectrometer and imager)” & “Technological developments needed for the

construction of MIDIR (Mid-IR spectrometer and imager) at the E-ELT (European Extremely Large Telescope)”

Dr. F. Malbet (LAOG, Grenoble, France; VSI PI); “2nd Generation VLTI instruments under study, the particular case of VSI (VLTI Spectro Imager)”

Dr. P. Kern (LAOG, Grenoble, France; VSI project manager); “Construction of the 2nd generation VLTI instruments and technological challenges; the special case of VSI (VLTI Spectro Imager)”

(4)

11/4/2008

11/4/2008 9th Meeting of the FNRS Contact Group 9th Meeting of the FNRS Contact Group

"Astronomy & Astrophysics"

Références

Documents relatifs

Since the pioneering work of the SOLSE/LORE experiment (McPeters et al., 2000), it has been established that the limb scattering technique is a viable method for

For the analysis of the oral discussions, on the one hand, we have taken into account some of the dimensions characterising the quality of this decision-making

Bien sûr, tous les garçons ne sont pas identiques, les plus malins, les plus aventureux, les plus délurés, savaient que cette fille là, leur tournerait la tête plus sûrement que

L’archive ouverte pluridisciplinaire HAL, est destinée au dépôt et à la diffusion de documents scientifiques de niveau recherche, publiés ou non, émanant des

L’objectif de cet article est double, mesurer l’incidence de la crise financière sur la création de la valeur partenariale et son appropriation par les parties prenantes explicites

The S-wave separation at high masses is impossible without a detailed partial wave analysis (PWA) because the contribution of this wave is hidden by the higher spin waves which

An instrument with such features is called FIRST (Fibered Imager foR a Single Telescope) and is currently installed on the 8-meter Subaru Telescope as part of the Subaru Corono-

SPHERE data with IRDIS and IFS are usually normalized using the flux calibration, which is obtained by observing a star o ff set out of the focal plane coronagraphic mask,