A Tag Contract Framework for Modeling Heterogeneous Systems
Texte intégral
Figure
Documents relatifs
L’archive ouverte pluridisciplinaire HAL, est destinée au dépôt et à la diffusion de documents scientifiques de niveau recherche, publiés ou non, émanant des
In this paper we propose a language called QoSCL (defined as an add-on to the UML2.0 component model) to let the designer explicitly describe and manipulate these higher
The contractor (or leader in the case of a joint tender) must send an invoice for payment of the balance within 60 days of the end of the period of provision of the services,
The contractor (or leader in the case of a joint tender) must send an invoice for payment of the balance within 60 days of the end of the period of provision of the services,
The contractor is liable for damage incurred by the contracting authority as a result of the termination of the FWC or a specific contract, including the additional cost of
The contractor (or leader in the case of a joint tender) must send an invoice for payment of the balance within 60 days of the end of the period of provision of the services,
II.6.3 The contractor is liable for any loss or damage caused to the contracting authority during or as a consequence of implementation of the FWC, including in the event
The contractor is liable for damage incurred by the contracting authority as a result of the termination of the FWC or a specific contract including the cost